What is included in a control chart?

A.
Baselines
B.
Planned Value
C.
Upper specification limit
D.
Expenditure
Explanation:
Control Charts are graphs used to analyse and communicate the variability of a process (or project activity) over time.The components include the process mean the Upper Control Limit (UCL) and the Lower Control Limit (LCL).
Data points within this range are generally though of as “In Control”.