Which of the following statements about the Project Initiation Documentation are true? 1.
The Project Initiation Documentation is used to ensure that a sound basis exists. 2. The
Project Initiation Documentation should be updated at the end of each stage to reflect the
current status of a project before the Project Board authorizes a project,
A.
Only 2 is true
B.
Both 1 and 2 are true
C.
Neither 1 or 2 are true
D.
Only 1 is true
the second sentence ends with a coma, which doesn’t make sense. But on top of that, it sounds strange that the project board authorizes the project at the end of each stage. Shouldnt they just authorize the nex stage, or request an exception plan or premature closure?
2
0
The answer B is right, Managing Successful Projects With PRINCE2, Section A.20.1
0
0
The statements should read as following:
1. The Project Initiation Documentation is used to ensure that a sound basis exists before the Project Board authorizes a project
2. The Project Initiation Documentation should be updated at the end of each stage to reflect the current status of a project
4
0