Which technique is utilized in the Control Schedule process?
A. Performance measure
B. Baseline schedule
C. Schedule network analysis
D. Variance analysis
One Comment on “Which technique is utilized in the Control Schedule process?”
Biswaranjan Beherasays:
according to PMBOK5, PERFORMANCE REVIEW SHOULD BE THE ANSWER.
Variance Analysis as a tool and technique is used only in Control Scope and “variance and trend analysis” is used in control risk.
according to PMBOK5, PERFORMANCE REVIEW SHOULD BE THE ANSWER.
Variance Analysis as a tool and technique is used only in Control Scope and “variance and trend analysis” is used in control risk.
0
0