PrepAway - Latest Free Exam Questions & Answers

Which two configuration changes should the administrator make?

— Exhibit —

— Exhibit —

The administrator needs to modify the problematic configuration shown in the exhibit to meet the
following requirements:
1. Uplink ports must connect to a 2-port Etherchannel connection. 2. Traffic must pass, even in
the event of a port failure.
Which two configuration changes should the administrator make? (Choose two.)

PrepAway - Latest Free Exam Questions & Answers

A.
Change the Load balancing algorithm to Route based on ip hash

B.
Change the Load balancing algorithm to Route based on physical NIC load

C.
Move Uplink 1 into Active Uplinks and Uplink 2 into Standby Uplinks

D.
Move both uplinks into the Active Uplinks

Explanation:

7 Comments on “Which two configuration changes should the administrator make?

  1. JanK says:

    Route Based on IP Hash –
    Network adapter redundancy. If a NIC fails and the link-state goes down, the remaining NICs in the team continue passing traffic




    0



    0
  2. Edwin.Castellanos says:

    A & D are required. As mentioned about etherchannel requires Route Based on IP Hash and per the image both uplinks require to be “moved” to the active status.




    0



    0
  3. razvan says:

    Configuration of EtherChannel
    http://kb.vmware.com/selfservice/microsites/search.do?language=en_US&cmd=displayKC&externalId=1004048

    Note: The LACP support in vSphere Distributed Switch 5.1 supports only IP hash load balancing. In vSphere Distributed Switch 5.5, all the load balancing algorithms of LACP are supported:

    Do not use beacon probing with IP HASH load balancing.
    Do not configure standby or unused uplinks with IP HASH load balancing.
    vSphere Distributed Switch 5.1 only supports one EtherChannel per vNetwork Distributed Switch (vDS). However, vSphere Distributed Switch 5.5 supports multiple LAGs.




    0



    0
  4. Pat says:

    A and D.

    D is indeed needed.

    For A, it’s more clear with this link for vSphere 5.5:

    http://pubs.vmware.com/vsphere-55/index.jsp#com.vmware.vsphere.networking.doc/GUID-809743E1-F366-4454-9BA5-9C3FD8C56D32.html

    “Note
    IP-based teaming requires that the physical switch be configured with etherchannel. For all other options, disable etherchannel.”

    The key here is one of the requirements: “Uplink ports must connect to a 2-port Etherchannel connection”.