PrepAway - Latest Free Exam Questions & Answers

What logic does IBM Maximo Asset Management V7.5 use to assign a description to the generated child work order

When utilizing a route, the Child Work Orders option is specified. What logic does IBM Maximo Asset
Management V7.5 use to assign a description to the generated child work orders?

PrepAway - Latest Free Exam Questions & Answers

A.
If the route record has a description, it becomes the child work order description.

B.
If the route stop has no description and it refers to an asset, the work order description is the
asset description.

C.
If the route stop references a job plan, the work order description is a concatenation of the job
plan identifier and the job plan description.

D.
If the route stop has no description and it refers to a location, the work order description is a
concatenation of the location identifier and location description


Leave a Reply