Which of the following statements concerning acceptance sampling is false?

A.
Used when expensive and time-consuming to test the product 100%.
B.
The number of allowable defects before lot is rejected is predetermined.
C.
Inspection and test standards must be established to ensure that procedures can adequately determine conformance and non-conformance.
D.
All of the above are true.