Which two conditions should exist in order to create a meter-based preventive maintenance and generate a work

Which two conditions should exist in order to create a meter-based preventive maintenance and generate a work order from it? (Choose Two.)

PrepAway - Latest Free Exam Questions & Answers

A.
The meter must be calibrated.

B.
The meter should have an ACTIVE status.

C.
The meter should be assigned to the asset.

D.
The asset should have an OPERATING status.

E.
Condition Monitoring point should be created for the meter.