A fertilizer plant is considering IBM Maximo Asset Management (IMAM). Most of the assets in the plant are new, and a key requirement from the contractor is to track the maintenance cost of the assets under warranty separately so that it can be back-charged to the manufacturer. Through which two steps can IMAM be configured to have a message pop up when a work order is created for an asset under warranty? (Choose two.)
A.
A valid warranty contract should exist for the asset.
B.
Warranty date is validated against the warranty contract for the asset.
C.
The warranty date is defined in the Warranty Date field on the Asset application.
D.
The counter for the warranty date starts from the date when the asset was created.
E.
The Display Warranty Status should be selected in Work Order options in Organization application.