A pair of WLCs have been configured in a mobility group. The WLC reports that the control
path is up, but the data path remains down. What two settings should the engineer check to
remedy the issue?

A.
UDP ports 16666 and 16667 are open/allowed between the two controllers.
B.
The controllers have the same location name
C.
The controllers do not have the same RF network name
D.
The service port IP is the same on both controllers.
E.
UDP port 97 is open/allowed between the two controllers.
F.
The virtual interface IP is the same on both controllers.
Explanation: