###BeginCaseStudy###
Case Study: 1
Contoso, Ltd Case A
Overview
Contoso, Ltd., is a recruiting and staffing company that has offices throughout North
America.
The company has a main office and six branch offices. The main office is located in Miami.
The branch offices are located in New York. Seattle, Los Angeles, Montreal, Toronto, and
Vancouver.
Existing Environment
Network Infrastructure
The network contains one Active Directory domain named contoso.com.
The main office has the following servers:
• One file server that maintains multiples shares
• Two domain controllers configured as DNS servers
• One Windows Server Update Services (WSUS) server
• Two DHCP servers that each have a scope for all of the subnets
• Two servers that have Failover Clustering configured and are
used as virtualization hosts
• One server that has Microsoft SQL Server 2012 installed and
maintains a customer relationship management (CRM) database
Each branch office has the following servers:
• One domain controller configured as a DNS server
• One DHCP server that has a single scope for its respective
office
Each office has a single subnet. The network speed of the local area network (LAN) is 1
gigabit per second. All of the offices have a high-speed connection to the Internet. The
offices connect to each other by using VPN appliances.
Current Issues
Users report that it can take a long time to download files from network shares in the main
office.
A root cause analysis identifies that network traffic peaks when the users experience this
issue.
Requirements
Planned Changes
The company plans to implement the following changes:
• Replace all of the domain controllers with new servers that run
Windows Server 2012.
• Upgrade the CRM application to use a web-based application
that connects to the current CRM database. The web application will
store session data in the memory of each web server.
• Initially, deploy two front-end web servers to two virtual
machines. Additional virtual web servers will be deployed in the
future.
• Monitor the availability of the CRM application and create
alerts when the overall availability is less than 99 percent.

• Implement Microsoft System Center 2012 to manage the new
environment.
Business Requirements
The company identifies the following business requirements:
• Minimize hardware costs and software costs whenever
possible.
• Minimize the amount of network traffic over the VPN
whenever possible.
• Ensure that the users in the branch offices can access files
currently on the main office file server if an Internet link fails.
Technical Requirements
The company identifies the following technical requirements:
• Provide a highly available DHCP solution.
• Maintain a central database that contains the security events
from all of the servers. The database must be encrypted.
• Ensure that an administrator in the main office can manage the
approval of Windows updates and updates to third-party applications
for all of the users.
• Ensure that all of the domain controllers have the
ReliableTimeSource registry value in HKEY_LOCAL_MACHINE
\SYSTEM\CurrentControlSet\Services\W32Time\Parameters set to 1,
even if an administrator changes that value manually.
Virtualization Requirements
The company identifies the following virtualization requirements:
• Minimize the number of permissions and privileges assigned to
users.
• Ensure that the members of a group named Group2 can add a
WSUS server to the fabric.
• Ensure that a diagram view of the virtualization environment
can be generated dynamically.
• Minimize the amount of administrative effort required to
manage the virtualization environment.
• Prevent the failure of a front-end web server from affecting the
availability of the CRM application.
• Ensure that the members of a group named Group1 can create
new virtual machines in the Los Angeles office only.
• Only create virtual machine templates by using objects that
already exist in the System Center 2012 Virtual Machine Manager
(VMM) library.
• On the failover cluster in the main office, apply limited
distribution release (LDR) updates to the virtualization hosts without
disrupting the virtual machines hosted on the virtualization hosts.
###EndCaseStudy###

You are planning the deployment of System Center 2012 Virtual Machine Manager (VMM).
You need to identify which additional System Center 2012 product is required to meet the
virtualization requirements.
What should you include in the recommendation?

PrepAway - Latest Free Exam Questions & Answers

A.
App Controller

B.
Operations Manager

C.
Configuration Manager

D.
Service Manager