A customer is planning to move four HP BladeSystem c7000s to another location. The
Onboard Administrator firmware is at the current version. The disk drives and Virtual
Connect Flex-10 modules must be removed before shipment. Which design impact must be
considered if the Virtual Connect Flex-10 modules are not reinstalled in their original
locations?

PrepAway - Latest Free Exam Questions & Answers

A.
The Virtual Connect configurations on the installed chassis will be overwritten.

B.
The blade chassis will be reset to factory defaults.

C.
The original Virtual Connect configurations will remain intact.

D.
All server network and SAN connections will be disabled.

Explanation:
http://h20565.www2.hp.com/portal/site/hpsc/template.BINARYPORTLET/public/kb/docDispla
y/resource.process/?spf_p.tpst=kbDocDisplay_ws_BI&spf_p.rid_kbDocDisplay=docDisplayR
esURL&javax.portlet.begCacheTok=com.vignette.cachetoken&spf_p.rst_kbDocDisplay=wsr
p-resourceState%3DdocId%253Demr_nac038019142%257CdocLocale%253D&javax.portlet.endCacheTok=com.vignette.cachetoken
Connecting multiple enclosures
Virtual Connect supports the connection of up to four c7000 enclosures, which can reduce
the number of network connections per rack and also enables a single VC Manager to
control multiple enclosures. A single set of cables can be used to carry all external Ethernet
traffic from a single rack. Multiple enclosure support enables up to four c7000 enclosures to
be managed within a single Virtual Connect domain.