PrepAway - Latest Free Exam Questions & Answers

Which components do you propose to change to meet their budget goals without sacrificing their critical to qua

A small service provider customer is in the process of a merger and needs to purchase additional

IT infrastructure components to support the expansion of their customer base. The goal is to offer
same-day repair from any hardware failures and increased high availability from the servers to the
local array.
The new proposal provides the following Bill of Materials (BOM):
– HP StoreSure 2000 – 155 TB of Midline SAS SFF Drives – FC Controller Pair
– A pair of HP SN6000B 16Gb 48-port/48-port Active Fibre Channel switches
– HP P2000 Remote Snap Software
– HP SN1000 2 Port 16 Gb HBAs
– 24 Fibre Channel cables
– 10 HP ProLiant DL360 Gen8s
– vSphere Enterprise Plus and vCenter licenses from HP
– Call-to-repair 24×7 coverage with four-hour on-site response
The customer operating budget is constrained, and the price of the BOM is too high.
Which components do you propose to change to meet their budget goals without sacrificing their
critical to quality goals? (Select two.)

PrepAway - Latest Free Exam Questions & Answers

A.
Modify the vSphere Enterprise Plus licenses to vSphere Enterprise.

B.
Modify the HP SN6000B 48/48 switches to 48/24 switches.

C.
Modify the HP SN600B 48/48 switch count to a quantity of one.

D.
Modify the HBA connections by 50%.

E.
Modify the Support to Next Business Day.

Explanation:
If you remove one fabric it’s no longer a HA solution.
But they need only activate 12 ports on each switch, and vSphere Enterprise Plus only add
manageability
http://h18000.www1.hp.com/products/quickspecs/14212_div/14212_div.pdf
http://h18004.www1.hp.com/products/quickspecs/14104_div/14104_div.pdf


Leave a Reply