PrepAway - Latest Free Exam Questions & Answers

How should the engineer perform this installation?

An engineer is installing an HP R7000 UPS and an Extended Runtime Module (ERM) in an
existing HP 10642 G2 rack. This rack contains 10 ProLiant DL380e Gen8 servers mounted from
1U upward.

How should the engineer perform this installation?

PrepAway - Latest Free Exam Questions & Answers

A.
Mount the R7000 UPS at 10U in the 10642 G2 rack with the ERM on top of the R7000 UPS.

B.
Remove the lowest ProLiant DL380e Gen8 servers and mount the R7000 and the ERM at the
lowest position in the rack. Mount the removed ProLiant DL380e Gen8 servers at a higher position
in the 10642 G2 rack.

C.
Mount the R7000 at the highest position possible in the 10642 G2 rack with the ERM just below
the UPS.

D.
Remove the two lowest mounted ProLiant DL380e Gen8 servers and mount the R7000 at the
bottom of the 10642 G2 rack. Mount the two removed ProLiant DL380e Gen8 servers at the top of
the 10642 G2 rack. Mount the ERM above the remaining original mounted ProLiant DL380e Gen8
servers.

Explanation:

5 Comments on “How should the engineer perform this installation?

  1. Teddy says:

    B.
    Remove the lowest ProLiant DL380e Gen8 servers and mount the R7000 and the ERM at the
    lowest position in the rack. Mount the removed ProLiant DL380e Gen8 servers at a higher position
    in the 10642 G2 rack.




    0



    0
  2. The fact is, this can be a recognized investment vehicle specifically
    for the middle and upper class. Another approach to protect yourself being a property investor is by properly choosing what your organization entity should be.
    Till quite a while back, before tourism and real-estate Praia do Forte took a large leap, it turned out a
    normal fishing village.




    0



    0

Leave a Reply