You manage a solution deployed in two Azure subscriptions for testing and production. Both
subscriptions have virtual networks named fabVNet. You plan to add two new virtual machines
(VMs) in a new subnet. You have the following requirements:
– Deploy the new VMs to the virtual network in the testing subscription.
– Minimize any errors in defining the network changes.
– Minimize the work that will be required when the change is made to the
production virtual network.
Which three steps should you perform in sequence? To answer, move the appropriate actions from
the list of actions to the answer area and arrange them in the correct order.