PrepAway - Latest Free Exam Questions & Answers

Which two operations ensure these requirements are met?

An administrator is deploying several ESXi 5.x hosts. Centralized logging with accurate
timestamps is a requirement for the deployment. Which two operations ensure these requirements
are met? (Choose two.)

PrepAway - Latest Free Exam Questions & Answers

A.
Ensure TCP port 123 is not blocked

B.
Configure a syslog server on each host

C.
Configure ensure the hosts have the proper timezone configured

D.
Configure a syslog server on the vSphere Management Appliance

Explanation:

For centralized logging with accurate timestamps, you need to make sure TCP port 123 is not
blocked. You also need to configure a syslog server on the VSA.


Leave a Reply