What type of progress control is a Checkpoint Report?
What type of progress control is a Checkpoint Report?
\Nhat is the next action the Project Manager should consider?
Scenario:
The Ministry of Food Hygiene (MFH) has a quality management system which contains a
document control process to manage all documentation requirements. The document
control process was created by the MFH Quality Manager, who now maintains all of MFH’s
documents and performs an organization-wide configuration management role. The MFH
Quality Manager will administer the configuration management procedure for the
Restructuring project since this must comply with the MFH document control process.
Having created the Issue Report and analyzed the impact of removing the Facilities Division from
the scope of the Outsourcing project, the proposed option exceeds tolerance. \Nhat is the next
action the Project Manager should consider?
Which of the following is NOT within the authority of the Project Board?
Which of the following is NOT within the authority of the Project Board?
What products will be impacted by this change?
Scenario:
The Ministry of Food Hygiene (MFH) has a quality management system which contains a
document control process to manage all documentation requirements. The document
control process was created by the MFH Quality Manager, who now maintains all of MFH’s
documents and performs an organization-wide configuration management role. The MFH
Quality Manager will administer the configuration management procedure for the
Restructuring project since this must comply with the MFH document control process.
What products will be impacted by this change?
Which of the following is a Project Board control?
Which of the following is a Project Board control?
What additional risk will this place on the project?
Scenario:
The Ministry of Food Hygiene (MFH) has a quality management system which contains a
document control process to manage all documentation requirements. The document
control process was created by the MFH Quality Manager, who now maintains all of MFH’s
documents and performs an organization-wide configuration management role. The MFH
Quality Manager will administer the configuration management procedure for the
Restructuring project since this must comply with the MFH document control process.
What additional risk will this place on the project?
Which level of management in the project management team has the ability to review progress and decide whether
Which level of management in the project management team has the ability to review progress
and decide whether to continue, change or stop the project?
What will be the impact on the benefits?
Scenario:
The Ministry of Food Hygiene (MFH) has a quality management system which contains a
document control process to manage all documentation requirements. The document
control process was created by the MFH Quality Manager, who now maintains all of MFH’s
documents and performs an organization-wide configuration management role. The MFH
Quality Manager will administer the configuration management procedure for the
Restructuring project since this must comply with the MFH document control process.
What will be the impact on the benefits?
Which of the following options describes those stages?
There should be at least two management stages in a PRINCE2 project. Which of the following
options describes those stages?
If Project tolerances were threatened, who needs to be notified?
If Project tolerances were threatened, who needs to be notified?