PrepAway - Latest Free Exam Questions & Answers

Which of the following statements is true about residual risks?

Which of the following statements is true about residual risks?

PrepAway - Latest Free Exam Questions & Answers

A.
It is the probabilistic risk after implementing all security measures.

B.
It can be considered as an indicator of threats coupled with vulnerability.

C.
It is a weakness or lack of safeguard that can be exploited by a threat.

D.
It is the probabilistic risk before implementing all security measures.

Explanation:
The residual risk is the risk or danger of an action or an event, a method or a
(technical) process that still conceives these dangers even if all theoretically possible safety
measures would be applied. The formula to calculate residual risk is (inherent risk) x (control risk)
risks are considered as an indicator of threats coupled with vulnerability. In other words, security
risk is a probabilistic function of a given threat agent exercising a particular vulnerability and the
impact of that risk on the organization. Security risks can be mitigated by reviewing and taking
lack of safeguard that can be exploited by a threat, thus causing harm to the information systems
or networks. It can exist in hardware , operating systems, firmware, applications, and configuration
files. Vulnerability has been variously defined in the current context as follows: 1.A security
weakness in a Target of Evaluation due to failures in analysis, design, implementation, or
operation and such. 2.Weakness in an information system or components (e.g. system security
procedures, hardware design, or internal controls that could be exploited to produce an
information-related misfortune.) 3.The existence of a weakness, design, or implementation error
that can lead to an unexpected, undesirable event compromising the security of the system,
network, application, or protocol involved.