Which of the following is MOST likely to result from a business process reengineering (BPR) project?

Which of the following is MOST likely to result from a business process reengineering (BPR)
project?

PrepAway - Latest Free Exam Questions & Answers

A.
An increased number of people using technology
Router

B.
Significant cost savings, through a reduction in the complexity of information technology
As BPR is often technology oriented, and this technology is usually more complex and volatile
than in the past, cost savings do not often materialize in this areA.
Bridge

C.
A weaker organizational structures and less accountability
Repeater

D.
Increased information protection (IP) risk will increase
There is no reason for IP to conflict with a BPR project, unless the project is not run properly.
QUESTION 5
Which of the following devices extends the network and has the capacity to store frames and act
as a storage and forward device?
Gateway

B.
Significant cost savings, through a reduction in the complexity of information technology
As BPR is often technology oriented, and this technology is usually more complex and volatile
than in the past, cost savings do not often materialize in this areA.
Bridge

D.
Increased information protection (IP) risk will increase
There is no reason for IP to conflict with a BPR project, unless the project is not run properly.
QUESTION 5
Which of the following devices extends the network and has the capacity to store frames and act
as a storage and forward device?
Gateway

A.
An increased number of people using technology
Router

B.
Significant cost savings, through a reduction in the complexity of information technology
As BPR is often technology oriented, and this technology is usually more complex and volatile
than in the past, cost savings do not often materialize in this areA.
Bridge

C.
A weaker organizational structures and less accountability
Repeater

D.
Increased information protection (IP) risk will increase
There is no reason for IP to conflict with a BPR project, unless the project is not run properly.
QUESTION 5
Which of the following devices extends the network and has the capacity to store frames and act
as a storage and forward device?
Gateway

Explanation:

A BPR project more often leads to an increased number of people using technology, and this
would be a cause for concern. Incorrect answers:

A bridge connects two separate networks to form a logical network (e.g., joining an ethernet and
token network) and has the storage capacity to store frames and act as a storage and forward
device. Bridges operate at the OSI data link layer by examining the media access control header
of a data packet.

One Comment on “Which of the following is MOST likely to result from a business process reengineering (BPR) project?


Leave a Reply