Using the exhibit as a reference, the customer needs to implement a DR/BC solution using a
three site copy strategy to meet corporate requirements with a recovery point objective of 5 seconds or less.
Which of the following solutions will meet the customer requirements?

A.
3-way TS7700 grid
B.
XIV with asynchronous mirrors
C.
DS8899 with Metro/Global Mirror
D.
SAN Volume Controller with Storwize V7000 back-end storage and Global Mirror