A customer has a BladeCenter S (BCS) with an 8-core POWER6 blade, 1.5TB of storage
and an external LTO tape drive installed. They want to upgrade to a P0WER8. Which of the
following is the lowest cost recommendation to satisfy their requirement?

A.
S814
B.
POWER8 blade in the current BCS
C.
S824
D.
Flex System and POWER8 node