PrepAway - Latest Free Exam Questions & Answers

Which infrastructure is required for the new HMC?

An administrator has an existing HMC and POWER6 570 connected to a network switch. The
administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is
required for the new HMC?

PrepAway - Latest Free Exam Questions & Answers

A.
An additional switch for the new HMC .

B.
Asynchronous adapters on the new HMC .

C.
The two 570 servers are directly connected to the new HMC .

D.
One 570 is directly connected to the new HMC and the other is directly connected to the existing
HMC.


Leave a Reply