PrepAway - Latest Free Exam Questions & Answers

Category: 000-121

Exam 000-121: Virtualization Technical Support for IBM i -v1

what updates are required to support the addition of the new server into the network?

A customer has multiple POWERS 570 servers. The servers are controlled by multiple HMCs. The
customer is installing an additional Power 770 server in this environment but will retain their
existing HMCs. No updates to FSP or HMC levels have been made since installation of the
POWERS servers.
After reviewing the cover letters for ESP and HMC firmware levels, what updates are required to
support the addition of the new server into the network?

How many virtual Ethernet adapters need to be defined on the HMCI in the IBM i client, and VIO Server partitio

A client IBM i 7.1 partition is being hosted by dual VIO Server partitions (VIOS-1 & VIOS-2). A
Shared Ethernet Adapter (SEA) has been created in order to provide Ethernet failover capability
for the IBM i partition. The IBM i partition will use the Ethernet resources of the VIO Server
partitions.
How many virtual Ethernet adapters need to be defined on the HMCI in the IBM i client, and VIO
Server partition profiles to support SEA and failover?

What is the most likely cause of the problem?

A customer has purchased a new BladeCenter H (BCH) and POWER blade to run IBM i. The
POWER blade is configured with two Fibre Channel interlaces for attaching SAN and tape.
They have an IBM TS3500 tape library with a fibre channel connection, and current firmware is
running through a fibre switch to another IBM i system. One port on the existing switch and one
port in the BCH fibre switch has been zoned to provide a connection from the tape library to the
BCH.
After IBM i 7.1 SLIC and base OS are installed on the blade from IBM distribution media, the tape
library does not appear in the device configuration.
What is the most likely cause of the problem?


Page 1 of 1112345...10...Last »