PrepAway - Latest Free Exam Questions & Answers

Category: 000-121

Exam 000-121: Virtualization Technical Support for IBM i -v1

What is the most likely cause of this failure?

A tape adapter needs to be moved from one partition to another. On the HMC, after selecting the
partition which currently owns the adapter, the path below is followed:
Dynamic Logical Partitioning –> Physical Adapters –> Move or Remove
After selecting the appropriate resource and target partition, “OK” is selected. The HMC returns
the following error “Dynamic remove of I/O resources failed: The I/O slot dynamic logical
partitioning operation failed.”
What is the most likely cause of this failure?

What the most likely cause?

There are three Power Systems servers with redundant FSPs, and two HMCs. One HMC is in the
data center while the second is in operations. Each HMC is connected to its own private network
and each of the three systems are connected to both HMCs.
Two of the Power Systems servers and the HMC in the data center have been moved across the
room. They have been reconnected to the HMC network, and power has been applied to the HMC
and the first server. On the data center HMC the server shows up twice, once with “Authentication
failed” and the second with “no connection.” Connecting to ASM yields “incorrect password” on the
first instance, but works on the second instance.
What the most likely cause?

What is the minimum necessary to support this requirement?

A customer has a POWER6 520, with a 4-port Host Ethernet Adapter being shared by two
partitions. The customer is migrating to a 6-core Power 720. One partition will need one 100Mb

port to connect to an older Ethernet switch. The customer wants both partitions to run
independently from one another, and provide redundancy at the adapter level
What is the minimum necessary to support this requirement?


Page 5 of 11« First...34567...10...Last »