What clients should consider?
A Customer wants the new E870 installed in existing 19-inch rack.
What clients should consider?
what can A FlashSystem 840 connects to a PowerE870?
By what can A FlashSystem 840 connects to a PowerE870?
What is the maximum number of full height PCI slots ava…
A client with a single node E870 would like to attach two I/O expansion drawers to provide more PCI slots.
What is the maximum number of full height PCI slots available with this configuration?
How can Shared Storage Pools benefit this customer?
For budgeting purpose, a customer wants to set aside all the storage for a particular workload which will run on
12 LPARs in Power E870. The CIO is worried that allocating all the storage to each LPAR from the beginning
can lead to lack of storage in long term.
How can Shared Storage Pools benefit this customer?
What can be added to the E870 to satisfy their requirement?
A customer is purchasing a 1-node E870 and requires the following:
Two NICs
Five HBAs
Internal disk drives with redundant VIOS
What can be added to the E870 to satisfy their requirement?
Which of the following should be proposed to add the ad…
A customer has a 40-core E880 with 2TB of memory installed with 10 cores and 1TB of memory activated.
They want to move a Linux application from their x86 environment to the E880. The application is supported on
Linux on Power and requires 8 cores and 64GB of memory.
The Linux team is unfamiliar with the Power hardware.
Which of the following should be proposed to add the additional resources at the lowest cost?
What advantage would POWER8 Enterprise servers provide …
A customer has a significant investment in open source software for performing in-memory analytics. This
workload is currently deployed on Linux and recent x86 hardware.
What advantage would POWER8 Enterprise servers provide to this customer?
What is the correct process to give them more enablemen…
A customer has an E870 that is currently using Elastic Capacity on Demand (CoD) for processors and memory.
They have used all of their available processor enablement days.
What is the correct process to give them more enablement days?
What is required to program the accelerator?
A customer has an E850 and wants to add a GPU to enhance their financial trading application.
What is required to program the accelerator?
What would need to be done, if anything, to support thi…
A customer has an existing IBM E850 HA cluster that they are using for the SAP DB. They want to use HANA
and would like to have the E850 to be repurposed for this.
The E850 is a 32-core 1TB server with all cores and memory active. Only 50% of the memory is populated
using 64GB CDIMMs. The HANA DB requires 3TB.
What would need to be done, if anything, to support this requirement?