which of the following options is correct?
A user has a 12X drawer to connect to the server, but do not know if can migrate to E870, which of the
following options is correct?
Which is the component of the memory chip of Power8 CDI…
Which is the component of the memory chip of Power8 CDIMMS introduces?
Which virtualization technology al lows multiple operat…
A customer has an E870 with AIX, IBM i and RHEL installed. Which virtualization technology al lows multiple
operating systems to share the same adapter simultaneously with low CPU usage?
Which of the following should be proposed to add the ad…
A customer has a 40-core E880 with 2TB of memory installed with 10 cores and lTB of memory activated. They
want to move a Linux application from their x86 environment to the E880 The application is supported on Linuxon Power and requires 8 cores and 64GB of memory. The Linux team is unfamiliar with the Power hardware.
Which of the following should be proposed to add the additional resources at the lowest cost?
Which of the following satisfies the customer requireme…
A stockbroker runs their high speed trading application on a standalone Linux system. They would like to
consolidate the trading workload onto an existing VIOS managed Power E870. A single 10Gb Ethernet adapter
is used for all the existing partitions. Which of the following satisfies the customer requirement for minimum
network latency for the trading workload?
Which of the following steps will need to be completed …
A customer with a Power 780 (9179-MHD) is considering a model conversion to the Power E8SO (9119-MH E).
They currently have Elastic COD enabled.
Which of the following steps will need to be completed for them to continue using Elastic COD on the E880?
What is the minimum number of static processor activati…
A customer has a 40 core E870 and would like to use Mobile Capacity on Demand. What is the minimum
number of static processor activations that are required?
Where will Nova link run?
A customer is considering implementing Nova link for critical Enterprise workloads.
Where will Nova link run?
What is the correct process to give them more enablemen…
A customer has an E870 that is currently using Elastic Capacity on Demand (CoD) for processors and memory.
They have used all of their available processor enablement days. What is the correct process to give them
more enablement days?
Which feature of IBM Cloud Orchestrator (I CO) differen…
Which feature of IBM Cloud Orchestrator (I CO) differentiates it from IBM Cloud PowerVC Manager?