Which step should the engineer take to perform this task?

An engineer needs to limit the power consumption of a chassis without powering down any server nodes.

Which step should the engineer take to perform this task?

A. Use the CMC to configure the System Input Power Cap for the chassis

B. Use the iDRAC to configure the Power Cap Policy for each server node

C. Use the CMC to configure the Power Cap Policy for each server node
D. Use the iDRAC to configure the System Input Power Cap for the chassis