What must the engineer do to control the first blade with a connected monitor, keyboard, and mouse?
An engineer has connected a monitor, keyboard, and mouse to a VRTX chassis. The engineer is unable to see or control the first blade. What must the engineer do to control the first blade with a connected monitor, keyboard, and mouse? A. Map the KVM to the first blade in the Front Panel menu of […]
What is the most efficient method to perform this task?
An engineer has been given a new chassis and needs to configure the iDRACs on all servers prior to deploying an OS on them. The iDRACs need to be configured with IP addresses and a new root password. What is the most efficient method to perform this task? A. Use CMC QuickDeploy B. Use iDRAC […]
What is the cause?
An engineer is running an inventory report on a VRTX chassis group for a customer. When the engineer views the report, the engineer notices the inventory of one of the VRTX is missing one of its nodes. What is the cause? A. The VRTX group member is in Chassis Power State Off since the node […]
Which policy should the engineer choose?
An engineer has a new blade chassis that is ¾ full. The chassis has six power supplies. The chassis at peak power usage needs at minimum four power supplies. Redundancy is NOT a concern. The engineer needs a policy to meet the current needs and provide enough power to a fully populated chassis. Which policy […]
What should the engineer do to finish disbanding the chassis group?
A customer has five VRTXs in a chassis group that they need to disband. The engineer disbands the chassis group from the group leader, but a networking interruption prevents two of the VRTXs from getting the signal to leave the group. What should the engineer do to finish disbanding the chassis group? A. Remove the […]
What are two possible sources of the issue? (Choose two.)
An engineer is troubleshooting a blade server in an FX2s. The compute sled in SLOT 3 will NOT power on. The engineer has taken the server down to minimum to POST. The server still does NOT power on. The engineer then swaps sleds SLOT 2 and 3. The iDRAC initializes in SLOT 2 but SLOT […]
Which license type is required?
In VRTX the following features are enabled: 1. Server Module Firmware Update 2. Remote syslog 3. iDRAC Single Sign-on. 4. Server configuration 5. Chassis grouping 6. Enclosure level backup Which license type is required? A. CMC enterprise license B. CMC express license C. iDRAC express license D. iDRAC enterprise license Reference: http://en.community.dell.com/cfs-file/__key/telligent-evolution-components-attachments/13-4491-00-00-20-40-24-15/VRTX-CMC_5F00_Feature-Guide.pdf?forcedownload=true
Which step should the engineer take to perform this task?
An engineer needs to limit the power consumption of a chassis without powering down any server nodes. Which step should the engineer take to perform this task? A. Use the CMC to configure the System Input Power Cap for the chassis B. Use the iDRAC to configure the Power Cap Policy for each server node […]
How should the engineer quickly deploy the new server node with matching BIOS settings?
An engineer is deploying a new server node into an existing chassis for a virtualization cluster. The existing cluster nodes have many modified BIOS settings to meet workload needs. How should the engineer quickly deploy the new server node with matching BIOS settings? A. Use System Setup to configure dynamic profile settings based on workload. […]
What should the engineer do to fix this issue?
An engineer deploys an FX2 and plugs cables from GB1 and STK/GB2 into the management network switch for path and NIC redundancy. When the chassis is powered up, the management network is adversely affected. What should the engineer do to fix this issue? A. Plug the CMC Redundancy Dongle into GB1 and STK/GB2 B. Configure […]