PrepAway - Latest Free Exam Questions & Answers

Two technicians are asked to install a 6U server at location U25 in a 40U serve…

Two technicians are asked to install a 6U server at location U25 in a 40U serve

r rack. The rack has been properly stabilized to the floor. Which of the following tools would BEST be used to install the server?

A. A static strap.

B. A server lift.

C. A PDU.

D. A UPS.


Leave a Reply