How should the administrator verify the incomplete job …
An administrator has a scheduled policy that backs up 20 clients, each with multiple mount points and multiple
data streams enabled. One of the jobs has failed and is in an Incomplete state in the Activity Monitor.
How should the administrator verify the incomplete job runs prior to the next scheduled backup?
What may be the cause for the failure?
Which job type goes active next?
A NetBackup master server has commenced writing four long-running duplication jobs to an AdvancedDisk disk
pool. The value of Maximum concurrent jobs for the storage unit and Limit I/O streams for the disk pool are
both set to 4.
There are 35 jobs queued on the master server that require this disk pool:
5 replication jobs with priority 9999
10 backup jobs with priority 999
20 duplication jobs with priority 99
Two restore jobs that require this disk pool are then submitted with a default priority.
Which job type goes active next?
Which action is performed by the NetBackup deduplicatio…
Which action is performed by the NetBackup deduplication plug-in?
Which two steps should the administrator perform to res…
VMware type backups of a newly added Windows Server 2008 guest virtual machine are failing with the
following status:
The associated bpfis process log indicates that the attempt to quiesce this virtual machine failed.
Which two steps should the administrator perform to resolve the issue? (Select two.)A. enable VMware Tools in the virtual machine
Which command should the administrator use to recreate …
An administrator needs to recover the NetBackup master server catalog at a disaster recovery site, but the DR
files are unavailable.
Which command should the administrator use to recreate the DR file?
Which authentication method should an administrator run…
Which authentication method should an administrator run as a command in the NetBackup Appliance Shell
Menu (CLISH), under Settings > Security > Authentication, to configure and manage Network
Information Service (NIS) user registration?
When would the next backup run, if all prior backups co…
Refer to the exhibit.
A backup policy uses a Full Backup schedule with a schedule type of Frequency: 1 days. The start window
for the schedule is configured as shown in the exhibit:
The administrator runs a manual backup at 10:00 on Thursday.
When would the next backup run, if all prior backups completed successfully?
How can the administrator control the prioritization of…
An AdvancedDisk storage unit consistently reaches capacity, causing older, staged backups to expire.
How can the administrator control the prioritization of images that get removed?
How many jobs go Active when the job is started, exclud…
An administrator has a backup policy with the following policy attributes:
3 paths listed in the Backup Selections list
5 clients listed in the Clients listAllow multiple data streams is selected
Limit jobs per policy is set to 4
How many jobs go Active when the job is started, excluding parent jobs, assuming there are enough storage
resources to handle the expected jobs?