Which is a prerequisite in order for the CRC check to be executed during a SureBackup Job?
A. The .vbm file is corrupt
B. The repository the backup is stored at is an SMB share
C. One or mo
re of the SureBackup recovery verification tests failed
D. The Backup file integrity check option was enabled in the SureBackup job settings