After acquiring a company 300 hundred miles from their current office, a customer has asked EMC
to help to design a single-hop application recovery plan. After careful analysis of the workload and
available bandwidth, SRDF/AR was selected as the solution.
If the SRDF/AR cycle time is set to 90 minutes, what is the maximum potential data loss?
A.
1.5 hours of data
B.
2 hours of data
C.
3 hours of data
D.
4.5 hours of data
Explanation:
B is the correct answer
0
0
For 60 minutes its 2 hours , for 90 its 3 hours.
Answer is C
0
0