After acquiring a company 300 hundred miles from their current office, a customer has asked EMC
to help to design a single-hop application recovery plan. After careful analysis of the workload and
available bandwidth, SRDF/AR was selected as the solution.
If the SRDF/AR cycle time is set to 90 minutes, what is the maximum potential data loss?
A.
1.5 hours of data
B.
2 hours of data
—C. 3 hours of data
D.
4.5 hours of data
C. 3 hours – ie twice the cycle time
0
0
Or is it ? thoughts?
per Symmetrix Business Continuity Management Student Guide,
“The maximum data loss would be one copy cycle, this makes the RPO ~Twice the Cycle Time.”
0
0