In an SRDF/Star environment, which event requires an unplanned switch of the production workload?

In an SRDF/Star environment, which event requires an unplanned switch of the production workload?

PrepAway - Latest Free Exam Questions & Answers

A.
Network failure between the workload and either target site

B.
Failure of the asynchronous target site

C.
Failure of the synchronous target site

D.
Failure of the workload site

One Comment on “In an SRDF/Star environment, which event requires an unplanned switch of the production workload?

  1. Waldemaras says:

    D. Failure of workload site
    “When the Workload site disaster warrants a move of the production workload to the Synchronous or Asynchronous target site, an Unplanned Switch Operation becomes necessary.”