PrepAway - Latest Free Exam Questions & Answers

According to Check Point recommended practice; when deploying in a production environment, all SmartCenter for

True or False. According to Check Point recommended practice; when deploying in a production
environment, all SmartCenter for Pointsec – MI components should be installed on the same
physical server.

PrepAway - Latest Free Exam Questions & Answers

A.
False. While it is possible to install all components to a single device, this is not recommended
in a production environment as this may cause anomalous behavior when operating under a full
load.

B.
True. All components can be installed on the same server, provided that the hardware is
sufficient, otherwise, there may be anomalous behavior when under full load.

C.
True. All components can run on a single physical device with no ill effects.

D.
False. While it is possible to install all components to a single device, even in a scenario where
the hardware would be able to handle the extra load, there may be service or memory conflicts.

Explanation:


Leave a Reply