What must be taken into account when integrating the new solution design?

Refer to the exhibit.

You are preparing an installation plan with one of your storage engineers.
The customer wants to extend their SAN fabric from four switches to eight switches.
What must be taken into account when integrating the new solution design?

PrepAway - Latest Free Exam Questions & Answers

A.
EVA6400 will achieve more host port throughput with higher switch count in the fabric.

B.
Connected hosts will fail fabric login.

C.
BladeSystem SAN switches cannot be extended with external switches by default.

D.
Merging of fabrics could fail if no further configuration or planning is performed.

Explanation: