Which three tasks can be selected from the home page of an ESXi host?
Which three tasks can be selected from the home page of an ESXi host? (Choose three.)
What is true about the inclusion of this driver in the image?
An administrator has purchased a new 10GB Converged Network Adapter (CNA) for installation in
a system that is running ESXi 5.x. The administrator has downloaded the latest driver from the
hardware vendor and wants to include the driver in an image. The image profile acceptance level
is set to VMwareSupported. The acceptance level of the driver is VMwareSupported.
What is true about the inclusion of this driver in the image?
What options are available for the kickstart file?
An administrator plans to use an upgrade script to upgrade a number of ESXi hosts.
What options are available for the kickstart file? (Choose two.)
What are the two most likely reasons that VMs cannot power up on this host?
An administrator has just completed an update of an ESXi 5.x host. Prior to the upgrade, a
backup of the host configuration was performed. After the upgrade, the backup was restored to
the upgraded host. Shortly after the upgrade was completed, the administrator receives
complaints that users are unable to power on virtual machines.
What are the two most likely reasons that VMs cannot power up on this host? (Choose two.)
Which three configuration settings will be migrated when upgrading a host from ESX 4.x Classic to ESXi 5.x?
Which three configuration settings will be migrated when upgrading a host from ESX 4.x Classic to
ESXi 5.x? (Choose three.)
which three actions should be taken?
Before upgrading an ESXi host to vSphere 5.x from vSphere 4.x, which three actions should be
taken? (Choose three.)
Which two VMware software components can be updated by Update Manager?
Which two VMware software components can be updated by Update Manager? (Choose two.)
The switch will include a secondary heartbeat network for H
An administrator has been tasked with upgrading a host from ESX 4.1 to ESXi 5. The host is
currently configured with a single vSwitch0 with default settings.
The upgraded host will have the following new requirements:
1. 116 virtual machines will be connected.
2. Four uplinks configured for port-based load balancing.
3. The switch will include a secondary heartbeat network for HA.
Which two statements are true about this configuration? (Choose two.)
Which two statements are true about this configuration?
A vSphere 5 implementation contains two ESXi hosts, ESXi01and ESXi02. There is a virtual
machine “VM21” connected to the Production port group on ESXi01.
ESXi01 has
vSwitch0, single uplink to 10.1.20.0/24
Production port group
VMkernel port for vMotion
VMKernel port for management
vSwitch1, single uplink to 10.1.40.0/24
Engineering port group
VMKernel port for NFS storage
ESXi02 has
vSwitch0, single uplink to 10.1.20.0/24
Engineering port group
VMkernel port for vMotion
VMKernel port for management
vSwitch1, single uplink to 10.1.40.0/24
Production port group
VMKernel port for NFS storage
Which two statements are true about this configuration? (Choose two.)
Which two statements are true about VLANs and port groups defined on a vSphere Standard Switch?
Which two statements are true about VLANs and port groups defined on a vSphere Standard
Switch? (Choose two.)