Which two statements are true about this configuration?
A vSphere 5 implementation contains two ESXi hosts, ESXi01and ESXi02. There is a virtual
machine “VM21” connected to the Production port group on ESXi01. ESXi01 has: vSwitch0,
single uplink to 4.1.20.0/24 Production port group VMkernel port for vMotion VMKernel port
for management vSwitch1, single uplink to 4.1.40.0/24 Engineering port group VMKernel
port for NFS storage ESXi02 has: vSwitch0, single uplink to 4.1.20.0/24 Engineering port
group VMkernel port for vMotion VMKernel port for management vSwitch1, single uplink to
4.1.40.0/24 Production port group VMKernel port for NFS storage Which two statements are
true about this configuration? (Choose two.)
What are two methods of maximizing VMFS performance for virtual machines across all the hosts in a cluster?
What are two methods of maximizing VMFS performance for virtual machines across all the
hosts in a cluster? (Choose two.)
Which two statements are true regarding vSphere standard switches?
Which two statements are true regarding vSphere standard switches? (Choose two.)
What are two consequences of deleting an VMFS datastore from an ESXi host?
What are two consequences of deleting an VMFS datastore from an ESXi host? (Choose
two.)
Which two statements are true regarding vSphere virtual switch uplinks?
Which two statements are true regarding vSphere virtual switch uplinks? (Choose two.)
Which three features can be used in combination with network-attached storage (NAS)?
Which three features can be used in combination with network-attached storage (NAS)?
(Choose three.)
What two steps can be taken in a vSphere 5 environment to minimize the impact of the downtime?
The storage administrator is preparing an action plan to upgrade a Fibre Channel storage
array. The current plan will result in extended downtime for a VMFS LUN that is part of a
SDRS cluster. What two steps can be taken in a vSphere 5 environment to minimize the
impact of the downtime? (Choose two.)
(Choose three.)
Select three of the steps for configuring iSCSI Software Initiator multipathing when load
balancing with a single vSphere standard switch. (Choose three.)
What other two components must be modified to enable jumbo frames support for the software iSCSI initiator?
The storage administrator has recommended testing the performance benefits of jumbo
frames and enabled jumbo frames on the storage array. The VMware administrator has
enabled jumbo frames on the VMkernel port used for the software iSCSI initiator. What
other two components must be modified to enable jumbo frames support for the software
iSCSI initiator? (Choose two.)
What two statements regarding the VSWP file are true?
What two statements regarding the VSWP file are true? (Choose two.)