Which of the following options should be selected in order to temporarily bring up a production VM that has
been previously been replicated to the DR site, while the production VM itself is brought down by a problem?
A.
Failback of the Replica VM
B.
Failover Plan
C.
Planned Failover of the Replica VM
D.
Failover of the Replica VM
“brought down by a problem” – why the hell is it a planned failover?))
may be D is correct?