PrepAway - Latest Free Exam Questions & Answers

Which two (2) actions should be taken before plugging the replacement switch into the fabric?

A Fibre Channel switch failed in your fabric and a replacement switch has been delivered. Which two
(2) actions should be taken before plugging the replacement switch into the fabric? (Choose two.)

PrepAway - Latest Free Exam Questions & Answers

A.
Delete the fabric records of the old switch from the Fabric.

B.
Configure the new switch in to the current zone configuration.

C.
Delete the zone configuration information on the replacement switch.

D.
Set the Domain ID of the replacement switch to the Domain ID of the failed switch.


Leave a Reply