You need to create a service template for the web servers used by the CRM application.What should you include

###BeginCaseStudy###
Topic 1, Contoso, Ltd Case A
Overview
Contoso, Ltd., is a recruiting and staffing company that has offices throughout North America.
The company has a main office and six branch offices. The main office is located in Miami. The branch
offices are located in New York. Seattle, Los Angeles, Montreal, Toronto, and Vancouver.
Existing Environment
Network Infrastructure
The network contains one Active Directory domain named contoso.com.
The main office has the following servers:
 One file server that maintains multiples shares
 Two domain controllers configured as DNS servers
 One Windows Server Update Services (WSUS) server
 Two DHCP servers that each have a scope for all of the subnets
 Two servers that have Failover Clustering configured and are used as virtualization hosts
 One server that has Microsoft SQL Server 2012 installed and maintains a customer relationship
management (CRM) database
Each branch office has the following servers:
 One domain controller configured as a DNS server
 One DHCP server that has a single scope for its respective office
Each office has a single subnet. The network speed of the local area network (LAN) is 1 gigabit per
second. All of the offices have a high-speed connection to the Internet. The offices connect to each other
by using VPN appliances.
Current Issues
Users report that it can take a long time to download files from network shares in the main office.A root cause analysis identifies that network traffic peaks when the users experience this issue.
Requirements
Planned Changes
The company plans to implement the following changes:
 Replace all of the domain controllers with new servers that run Windows Server 2012.
 Upgrade the CRM application to use a web-based application that connects to the current CRM
database. The web application will store session data in the memory of each web server.
 Initially, deploy two front-end web servers to two virtual machines. Additional virtual web
servers will be deployed in the future.
 Monitor the availability of the CRM application and create alerts when the overall availability is
less than 99 percent.
 Implement Microsoft System Center 2012 to manage the new environment.
Business Requirements
The company identifies the following business requirements:
 Minimize hardware costs and software costs whenever possible.
 Minimize the amount of network traffic over the VPN whenever possible.
 Ensure that the users in the branch offices can access files currently on the main office file
server if an Internet link fails.
Technical Requirements
The company identifies the following technical requirements:
 Provide a highly available DHCP solution.
 Maintain a central database that contains the security events from all of the servers. The
database must be encrypted.
 Ensure that an administrator in the main office can manage the approval of Windows updates
and updates to third-party applications for all of the users.
 Ensure that all of the domain controllers have the ReliableTimeSource registry value in
HKEY_LOCAL_MACHINE \\SYSTEM\\CurrentControlSet\\Services\\W32Time\\Parameters set to 1,
even if an administrator changes that value manually.
Virtualization Requirements
The company identifies the following virtualization requirements:
 Minimize the number of permissions and privileges assigned to users.
 Ensure that the members of a group named Group2 can add a WSUS server to the fabric.
 Ensure that a diagram view of the virtualization environment can be generated dynamically.
 Minimize the amount of administrative effort required to manage the virtualization
environment. Prevent the failure of a front-end web server from affecting the availability of the CRM
application.
 Ensure that the members of a group named Group1 can create new virtual machines in the Los
Angeles office only.
 Only create virtual machine templates by using objects that already exist in the System Center
2012 Virtual Machine Manager (VMM) library.
 On the failover cluster in the main office, apply limited distribution release (LDR) updates to
the virtualization hosts without disrupting the virtual machines hosted on the virtualization
hosts.
###EndCaseStudy###

You need to create a service template for the web servers used by the CRM application.What should you include in the service template?

What should you include in the recommendation?

###BeginCaseStudy###
Topic 1, Contoso, Ltd Case A
Overview
Contoso, Ltd., is a recruiting and staffing company that has offices throughout North America.
The company has a main office and six branch offices. The main office is located in Miami. The branch
offices are located in New York. Seattle, Los Angeles, Montreal, Toronto, and Vancouver.
Existing Environment
Network Infrastructure
The network contains one Active Directory domain named contoso.com.
The main office has the following servers:
 One file server that maintains multiples shares
 Two domain controllers configured as DNS servers
 One Windows Server Update Services (WSUS) server
 Two DHCP servers that each have a scope for all of the subnets
 Two servers that have Failover Clustering configured and are used as virtualization hosts
 One server that has Microsoft SQL Server 2012 installed and maintains a customer relationship
management (CRM) database
Each branch office has the following servers:
 One domain controller configured as a DNS server
 One DHCP server that has a single scope for its respective office
Each office has a single subnet. The network speed of the local area network (LAN) is 1 gigabit per
second. All of the offices have a high-speed connection to the Internet. The offices connect to each other
by using VPN appliances.
Current Issues
Users report that it can take a long time to download files from network shares in the main office.A root cause analysis identifies that network traffic peaks when the users experience this issue.
Requirements
Planned Changes
The company plans to implement the following changes:
 Replace all of the domain controllers with new servers that run Windows Server 2012.
 Upgrade the CRM application to use a web-based application that connects to the current CRM
database. The web application will store session data in the memory of each web server.
 Initially, deploy two front-end web servers to two virtual machines. Additional virtual web
servers will be deployed in the future.
 Monitor the availability of the CRM application and create alerts when the overall availability is
less than 99 percent.
 Implement Microsoft System Center 2012 to manage the new environment.
Business Requirements
The company identifies the following business requirements:
 Minimize hardware costs and software costs whenever possible.
 Minimize the amount of network traffic over the VPN whenever possible.
 Ensure that the users in the branch offices can access files currently on the main office file
server if an Internet link fails.
Technical Requirements
The company identifies the following technical requirements:
 Provide a highly available DHCP solution.
 Maintain a central database that contains the security events from all of the servers. The
database must be encrypted.
 Ensure that an administrator in the main office can manage the approval of Windows updates
and updates to third-party applications for all of the users.
 Ensure that all of the domain controllers have the ReliableTimeSource registry value in
HKEY_LOCAL_MACHINE \\SYSTEM\\CurrentControlSet\\Services\\W32Time\\Parameters set to 1,
even if an administrator changes that value manually.
Virtualization Requirements
The company identifies the following virtualization requirements:
 Minimize the number of permissions and privileges assigned to users.
 Ensure that the members of a group named Group2 can add a WSUS server to the fabric.
 Ensure that a diagram view of the virtualization environment can be generated dynamically.
 Minimize the amount of administrative effort required to manage the virtualization
environment. Prevent the failure of a front-end web server from affecting the availability of the CRM
application.
 Ensure that the members of a group named Group1 can create new virtual machines in the Los
Angeles office only.
 Only create virtual machine templates by using objects that already exist in the System Center
2012 Virtual Machine Manager (VMM) library.
 On the failover cluster in the main office, apply limited distribution release (LDR) updates to
the virtualization hosts without disrupting the virtual machines hosted on the virtualization
hosts.
###EndCaseStudy###

You need to recommend a solution for deploying the web servers for the CRM application.
The solution must meet the visualization requirements.
What should you include in the recommendation?

You need to deploy the dedicated storage servers to support the new web application servers

###BeginCaseStudy###
Topic 1, Contoso, Ltd Case A
Overview
Contoso, Ltd., is a recruiting and staffing company that has offices throughout North America.
The company has a main office and six branch offices. The main office is located in Miami. The branch
offices are located in New York. Seattle, Los Angeles, Montreal, Toronto, and Vancouver.
Existing Environment
Network Infrastructure
The network contains one Active Directory domain named contoso.com.
The main office has the following servers:
 One file server that maintains multiples shares
 Two domain controllers configured as DNS servers
 One Windows Server Update Services (WSUS) server
 Two DHCP servers that each have a scope for all of the subnets
 Two servers that have Failover Clustering configured and are used as virtualization hosts
 One server that has Microsoft SQL Server 2012 installed and maintains a customer relationship
management (CRM) database
Each branch office has the following servers:
 One domain controller configured as a DNS server
 One DHCP server that has a single scope for its respective office
Each office has a single subnet. The network speed of the local area network (LAN) is 1 gigabit per
second. All of the offices have a high-speed connection to the Internet. The offices connect to each other
by using VPN appliances.
Current Issues
Users report that it can take a long time to download files from network shares in the main office.A root cause analysis identifies that network traffic peaks when the users experience this issue.
Requirements
Planned Changes
The company plans to implement the following changes:
 Replace all of the domain controllers with new servers that run Windows Server 2012.
 Upgrade the CRM application to use a web-based application that connects to the current CRM
database. The web application will store session data in the memory of each web server.
 Initially, deploy two front-end web servers to two virtual machines. Additional virtual web
servers will be deployed in the future.
 Monitor the availability of the CRM application and create alerts when the overall availability is
less than 99 percent.
 Implement Microsoft System Center 2012 to manage the new environment.
Business Requirements
The company identifies the following business requirements:
 Minimize hardware costs and software costs whenever possible.
 Minimize the amount of network traffic over the VPN whenever possible.
 Ensure that the users in the branch offices can access files currently on the main office file
server if an Internet link fails.
Technical Requirements
The company identifies the following technical requirements:
 Provide a highly available DHCP solution.
 Maintain a central database that contains the security events from all of the servers. The
database must be encrypted.
 Ensure that an administrator in the main office can manage the approval of Windows updates
and updates to third-party applications for all of the users.
 Ensure that all of the domain controllers have the ReliableTimeSource registry value in
HKEY_LOCAL_MACHINE \\SYSTEM\\CurrentControlSet\\Services\\W32Time\\Parameters set to 1,
even if an administrator changes that value manually.
Virtualization Requirements
The company identifies the following virtualization requirements:
 Minimize the number of permissions and privileges assigned to users.
 Ensure that the members of a group named Group2 can add a WSUS server to the fabric.
 Ensure that a diagram view of the virtualization environment can be generated dynamically.
 Minimize the amount of administrative effort required to manage the virtualization
environment. Prevent the failure of a front-end web server from affecting the availability of the CRM
application.
 Ensure that the members of a group named Group1 can create new virtual machines in the Los
Angeles office only.
 Only create virtual machine templates by using objects that already exist in the System Center
2012 Virtual Machine Manager (VMM) library.
 On the failover cluster in the main office, apply limited distribution release (LDR) updates to
the virtualization hosts without disrupting the virtual machines hosted on the virtualization
hosts.
###EndCaseStudy###

You need to deploy the dedicated storage servers to support the new web application servers.
What should you do?

A server named CA1 has the Active Directory Certificate Services server role installed and is configured as an

###BeginCaseStudy###
Topic 2, Proseware Inc
General Overview
Proseware Inc., is a manufacturing company that has 4,000 employees.
Proseware works with a trading partner named Fabrikam, Inc.
Physical Locations
Proseware has a main office and two branch offices. The main office is located in London. The branch
offices are located in Madrid and Berlin. Proseware has a sales department based in the London office
and a research department based in the Berlin office.
The offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Proseware rents space at a hosting company. All offices have a dedicated WAN link to the hosting
company. Web servers that are accessible from the Internet are located at the hosting company.
Active Directory
The Proseware network contains an Active Directory forest named proseware.com. The forest contains a
single domain. The forest functional level is Windows Server 2012.
Each office contains three domain controllers. An Active Directory site is configured for each office.
System state backups are performed every day on the domain controllers by using System Center 2012
R2 Data Protection Manager (DPM).
Virtualization
Proseware has Hyper-V hosts that run Windows Server 2012 R2. Each Hyper-V host manages eight to ten
virtual machines. The Hyper-V hosts are configured as shown in the following table.

All of the Hyper-V hosts store virtual machines on direct-attached storage (DAS).
Servers
All servers run Windows Server 2012 R2. All of the servers are virtualized, except for the Hyper-V hosts.
VDI1 and VDI2 use locally attached storage to host virtual hard disk (VHD) files. The VHDs use the .vhd
format.
A line-of-business application named SalesApp is used by the sales department and runs on a server
named APP1. APP1 is hosted on HyperV2.
A server named CA1 has the Active Directory Certificate Services server role installed and is configured
as an enterprise root certification authority (CA) named ProsewareCA.
Ten load-balanced web servers hosted on HyperV7 and HyperV8 run the Internet-facing web site that
takes orders from Internet customers.
System Center 2012 R2 Operations Manager is used to monitor the health of the servers on the network.
All of the servers are members of the proseware.com domain, except for the servers located in the
perimeter network.
Client Computers
All client computers run either Windows 8.1 or Windows 7. Some of the users in the London office
connect to pooled virtual desktops hosted on VDI1 and VDI2.
Problem Statements
Proseware identifies the following issues on the network:Virtualization administrators report that the load on the Hyper-V hosts is inconsistent. The virtualization
administrators also report that administrators fail to account for host utilization when creating new
virtual machines.
Users in the sales department report that they experience issues when they attempt to access SalesApp
from any other network than the one in the London office.
Sometimes, configuration changes are not duplicated properly across the web servers, resulting in
customer ordering issues. Web servers are regularly changed.
Demand for virtual desktops is increasing. Administrators report that storage space is becoming an issue
as they want to add more virtual machines.
In the past, some personally identifiable information (PII) was exposed when paper shredding
procedures were not followed.
Requirements
Planned Changes
Proseware plans to implement the following changes on the network:
 Implement a backup solution for Active Directory.
 Relocate the sales department to the Madrid office.
 Implement System Center 2012 R2 components, as required.
 Protect email attachments sent to Fabrikam that contain PII data so that the attachments
cannot be printed.
 Implement System Center 2012 R2 Virtual Machine Manager (VMM) to manage the virtual
machine infrastructure. Proseware does not plan to use private clouds in the near future.
 Deploy a new Hyper-V host named RESEARCH1 to the Berlin office. RESEARCH1 will be financed
by the research department. All of the virtual machines deployed to RESEARCH1 will use VMM
templates.
Technical Requirements
Proseware identifies the following virtualization requirements:
 The increased demand for virtual desktops must be met.
 Once System Center is deployed, all of the Hyper-V hosts must be managed by using VMM.
 If any of the Hyper-V hosts exceeds a set number of virtual machines, an administrator must be
notified by email.
 Network administrators in each location must be responsible for managing the Hyper-V hosts
in their respective location. The management of the hosts must be performed by using VMM. The network technicians in each office must be able to create virtual machines in their
respective office. The network technicians must be prevented from modifying the host server
settings.
 New virtual machines must be deployed to RESEARCH1 only if the virtual machine template
used to create the machine has a value specified for a custom property named CostCenter’ that
matches Research’.
The web site configurations must be identical on all web servers.
Security Requirements
Proseware identifies the following security requirements:
 All email messages sent to and from Fabrikam must be encrypted by using digital certificates
issued to users by the respective CA of their company. No other certificates must be trusted
between the organizations.
 Microsoft Word documents attached to email messages sent from Proseware to Fabrikam must
be protected.
 Privileges must be minimized, whenever possible.

###EndCaseStudy###

HOTSPOT
You need to recommend a design that meets the technical requirements for managing the Hyper-V hosts
by using VMM.
What should you recommend? To answer, select the appropriate options in the answer area.

A server named CA1 has the Active Directory Certificate Services server role installed…

###BeginCaseStudy###
Topic 2, Proseware Inc
General Overview
Proseware Inc., is a manufacturing company that has 4,000 employees.
Proseware works with a trading partner named Fabrikam, Inc.
Physical Locations
Proseware has a main office and two branch offices. The main office is located in London. The branch
offices are located in Madrid and Berlin. Proseware has a sales department based in the London office
and a research department based in the Berlin office.
The offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Proseware rents space at a hosting company. All offices have a dedicated WAN link to the hosting
company. Web servers that are accessible from the Internet are located at the hosting company.
Active Directory
The Proseware network contains an Active Directory forest named proseware.com. The forest contains a
single domain. The forest functional level is Windows Server 2012.
Each office contains three domain controllers. An Active Directory site is configured for each office.
System state backups are performed every day on the domain controllers by using System Center 2012
R2 Data Protection Manager (DPM).
Virtualization
Proseware has Hyper-V hosts that run Windows Server 2012 R2. Each Hyper-V host manages eight to ten
virtual machines. The Hyper-V hosts are configured as shown in the following table.

All of the Hyper-V hosts store virtual machines on direct-attached storage (DAS).
Servers
All servers run Windows Server 2012 R2. All of the servers are virtualized, except for the Hyper-V hosts.
VDI1 and VDI2 use locally attached storage to host virtual hard disk (VHD) files. The VHDs use the .vhd
format.
A line-of-business application named SalesApp is used by the sales department and runs on a server
named APP1. APP1 is hosted on HyperV2.
A server named CA1 has the Active Directory Certificate Services server role installed and is configured
as an enterprise root certification authority (CA) named ProsewareCA.
Ten load-balanced web servers hosted on HyperV7 and HyperV8 run the Internet-facing web site that
takes orders from Internet customers.
System Center 2012 R2 Operations Manager is used to monitor the health of the servers on the network.
All of the servers are members of the proseware.com domain, except for the servers located in the
perimeter network.
Client Computers
All client computers run either Windows 8.1 or Windows 7. Some of the users in the London office
connect to pooled virtual desktops hosted on VDI1 and VDI2.
Problem Statements
Proseware identifies the following issues on the network:Virtualization administrators report that the load on the Hyper-V hosts is inconsistent. The virtualization
administrators also report that administrators fail to account for host utilization when creating new
virtual machines.
Users in the sales department report that they experience issues when they attempt to access SalesApp
from any other network than the one in the London office.
Sometimes, configuration changes are not duplicated properly across the web servers, resulting in
customer ordering issues. Web servers are regularly changed.
Demand for virtual desktops is increasing. Administrators report that storage space is becoming an issue
as they want to add more virtual machines.
In the past, some personally identifiable information (PII) was exposed when paper shredding
procedures were not followed.
Requirements
Planned Changes
Proseware plans to implement the following changes on the network:
 Implement a backup solution for Active Directory.
 Relocate the sales department to the Madrid office.
 Implement System Center 2012 R2 components, as required.
 Protect email attachments sent to Fabrikam that contain PII data so that the attachments
cannot be printed.
 Implement System Center 2012 R2 Virtual Machine Manager (VMM) to manage the virtual
machine infrastructure. Proseware does not plan to use private clouds in the near future.
 Deploy a new Hyper-V host named RESEARCH1 to the Berlin office. RESEARCH1 will be financed
by the research department. All of the virtual machines deployed to RESEARCH1 will use VMM
templates.
Technical Requirements
Proseware identifies the following virtualization requirements:
 The increased demand for virtual desktops must be met.
 Once System Center is deployed, all of the Hyper-V hosts must be managed by using VMM.
 If any of the Hyper-V hosts exceeds a set number of virtual machines, an administrator must be
notified by email.
 Network administrators in each location must be responsible for managing the Hyper-V hosts
in their respective location. The management of the hosts must be performed by using VMM. The network technicians in each office must be able to create virtual machines in their
respective office. The network technicians must be prevented from modifying the host server
settings.
 New virtual machines must be deployed to RESEARCH1 only if the virtual machine template
used to create the machine has a value specified for a custom property named CostCenter’ that
matches Research’.
The web site configurations must be identical on all web servers.
Security Requirements
Proseware identifies the following security requirements:
 All email messages sent to and from Fabrikam must be encrypted by using digital certificates
issued to users by the respective CA of their company. No other certificates must be trusted
between the organizations.
 Microsoft Word documents attached to email messages sent from Proseware to Fabrikam must
be protected.
 Privileges must be minimized, whenever possible.

###EndCaseStudy###

DRAG DROP
You need to recommend a monitoring solution for Proseware.
Which three actions should you recommend performing in sequence? To answer, move the appropriate
actions from the list of actions to the answer area and arrange them in the correct order.

A server named CA1 has the Active Directory Certificate Services server role installed and is configured as an

###BeginCaseStudy###
Topic 2, Proseware Inc
General Overview
Proseware Inc., is a manufacturing company that has 4,000 employees.
Proseware works with a trading partner named Fabrikam, Inc.
Physical Locations
Proseware has a main office and two branch offices. The main office is located in London. The branch
offices are located in Madrid and Berlin. Proseware has a sales department based in the London office
and a research department based in the Berlin office.
The offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Proseware rents space at a hosting company. All offices have a dedicated WAN link to the hosting
company. Web servers that are accessible from the Internet are located at the hosting company.
Active Directory
The Proseware network contains an Active Directory forest named proseware.com. The forest contains a
single domain. The forest functional level is Windows Server 2012.
Each office contains three domain controllers. An Active Directory site is configured for each office.
System state backups are performed every day on the domain controllers by using System Center 2012
R2 Data Protection Manager (DPM).
Virtualization
Proseware has Hyper-V hosts that run Windows Server 2012 R2. Each Hyper-V host manages eight to ten
virtual machines. The Hyper-V hosts are configured as shown in the following table.

All of the Hyper-V hosts store virtual machines on direct-attached storage (DAS).
Servers
All servers run Windows Server 2012 R2. All of the servers are virtualized, except for the Hyper-V hosts.
VDI1 and VDI2 use locally attached storage to host virtual hard disk (VHD) files. The VHDs use the .vhd
format.
A line-of-business application named SalesApp is used by the sales department and runs on a server
named APP1. APP1 is hosted on HyperV2.
A server named CA1 has the Active Directory Certificate Services server role installed and is configured
as an enterprise root certification authority (CA) named ProsewareCA.
Ten load-balanced web servers hosted on HyperV7 and HyperV8 run the Internet-facing web site that
takes orders from Internet customers.
System Center 2012 R2 Operations Manager is used to monitor the health of the servers on the network.
All of the servers are members of the proseware.com domain, except for the servers located in the
perimeter network.
Client Computers
All client computers run either Windows 8.1 or Windows 7. Some of the users in the London office
connect to pooled virtual desktops hosted on VDI1 and VDI2.
Problem Statements
Proseware identifies the following issues on the network:Virtualization administrators report that the load on the Hyper-V hosts is inconsistent. The virtualization
administrators also report that administrators fail to account for host utilization when creating new
virtual machines.
Users in the sales department report that they experience issues when they attempt to access SalesApp
from any other network than the one in the London office.
Sometimes, configuration changes are not duplicated properly across the web servers, resulting in
customer ordering issues. Web servers are regularly changed.
Demand for virtual desktops is increasing. Administrators report that storage space is becoming an issue
as they want to add more virtual machines.
In the past, some personally identifiable information (PII) was exposed when paper shredding
procedures were not followed.
Requirements
Planned Changes
Proseware plans to implement the following changes on the network:
 Implement a backup solution for Active Directory.
 Relocate the sales department to the Madrid office.
 Implement System Center 2012 R2 components, as required.
 Protect email attachments sent to Fabrikam that contain PII data so that the attachments
cannot be printed.
 Implement System Center 2012 R2 Virtual Machine Manager (VMM) to manage the virtual
machine infrastructure. Proseware does not plan to use private clouds in the near future.
 Deploy a new Hyper-V host named RESEARCH1 to the Berlin office. RESEARCH1 will be financed
by the research department. All of the virtual machines deployed to RESEARCH1 will use VMM
templates.
Technical Requirements
Proseware identifies the following virtualization requirements:
 The increased demand for virtual desktops must be met.
 Once System Center is deployed, all of the Hyper-V hosts must be managed by using VMM.
 If any of the Hyper-V hosts exceeds a set number of virtual machines, an administrator must be
notified by email.
 Network administrators in each location must be responsible for managing the Hyper-V hosts
in their respective location. The management of the hosts must be performed by using VMM. The network technicians in each office must be able to create virtual machines in their
respective office. The network technicians must be prevented from modifying the host server
settings.
 New virtual machines must be deployed to RESEARCH1 only if the virtual machine template
used to create the machine has a value specified for a custom property named CostCenter’ that
matches Research’.
The web site configurations must be identical on all web servers.
Security Requirements
Proseware identifies the following security requirements:
 All email messages sent to and from Fabrikam must be encrypted by using digital certificates
issued to users by the respective CA of their company. No other certificates must be trusted
between the organizations.
 Microsoft Word documents attached to email messages sent from Proseware to Fabrikam must
be protected.
 Privileges must be minimized, whenever possible.

###EndCaseStudy###

You need to recommend changes to the virtual desktop infrastructure (VDI) environment.
What should you recommend?

A server named CA1 has the Active Directory Certificate Services server role installed and is configured as an

###BeginCaseStudy###
Topic 2, Proseware Inc
General Overview
Proseware Inc., is a manufacturing company that has 4,000 employees.
Proseware works with a trading partner named Fabrikam, Inc.
Physical Locations
Proseware has a main office and two branch offices. The main office is located in London. The branch
offices are located in Madrid and Berlin. Proseware has a sales department based in the London office
and a research department based in the Berlin office.
The offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Proseware rents space at a hosting company. All offices have a dedicated WAN link to the hosting
company. Web servers that are accessible from the Internet are located at the hosting company.
Active Directory
The Proseware network contains an Active Directory forest named proseware.com. The forest contains a
single domain. The forest functional level is Windows Server 2012.
Each office contains three domain controllers. An Active Directory site is configured for each office.
System state backups are performed every day on the domain controllers by using System Center 2012
R2 Data Protection Manager (DPM).
Virtualization
Proseware has Hyper-V hosts that run Windows Server 2012 R2. Each Hyper-V host manages eight to ten
virtual machines. The Hyper-V hosts are configured as shown in the following table.

All of the Hyper-V hosts store virtual machines on direct-attached storage (DAS).
Servers
All servers run Windows Server 2012 R2. All of the servers are virtualized, except for the Hyper-V hosts.
VDI1 and VDI2 use locally attached storage to host virtual hard disk (VHD) files. The VHDs use the .vhd
format.
A line-of-business application named SalesApp is used by the sales department and runs on a server
named APP1. APP1 is hosted on HyperV2.
A server named CA1 has the Active Directory Certificate Services server role installed and is configured
as an enterprise root certification authority (CA) named ProsewareCA.
Ten load-balanced web servers hosted on HyperV7 and HyperV8 run the Internet-facing web site that
takes orders from Internet customers.
System Center 2012 R2 Operations Manager is used to monitor the health of the servers on the network.
All of the servers are members of the proseware.com domain, except for the servers located in the
perimeter network.
Client Computers
All client computers run either Windows 8.1 or Windows 7. Some of the users in the London office
connect to pooled virtual desktops hosted on VDI1 and VDI2.
Problem Statements
Proseware identifies the following issues on the network:Virtualization administrators report that the load on the Hyper-V hosts is inconsistent. The virtualization
administrators also report that administrators fail to account for host utilization when creating new
virtual machines.
Users in the sales department report that they experience issues when they attempt to access SalesApp
from any other network than the one in the London office.
Sometimes, configuration changes are not duplicated properly across the web servers, resulting in
customer ordering issues. Web servers are regularly changed.
Demand for virtual desktops is increasing. Administrators report that storage space is becoming an issue
as they want to add more virtual machines.
In the past, some personally identifiable information (PII) was exposed when paper shredding
procedures were not followed.
Requirements
Planned Changes
Proseware plans to implement the following changes on the network:
 Implement a backup solution for Active Directory.
 Relocate the sales department to the Madrid office.
 Implement System Center 2012 R2 components, as required.
 Protect email attachments sent to Fabrikam that contain PII data so that the attachments
cannot be printed.
 Implement System Center 2012 R2 Virtual Machine Manager (VMM) to manage the virtual
machine infrastructure. Proseware does not plan to use private clouds in the near future.
 Deploy a new Hyper-V host named RESEARCH1 to the Berlin office. RESEARCH1 will be financed
by the research department. All of the virtual machines deployed to RESEARCH1 will use VMM
templates.
Technical Requirements
Proseware identifies the following virtualization requirements:
 The increased demand for virtual desktops must be met.
 Once System Center is deployed, all of the Hyper-V hosts must be managed by using VMM.
 If any of the Hyper-V hosts exceeds a set number of virtual machines, an administrator must be
notified by email.
 Network administrators in each location must be responsible for managing the Hyper-V hosts
in their respective location. The management of the hosts must be performed by using VMM. The network technicians in each office must be able to create virtual machines in their
respective office. The network technicians must be prevented from modifying the host server
settings.
 New virtual machines must be deployed to RESEARCH1 only if the virtual machine template
used to create the machine has a value specified for a custom property named CostCenter’ that
matches Research’.
The web site configurations must be identical on all web servers.
Security Requirements
Proseware identifies the following security requirements:
 All email messages sent to and from Fabrikam must be encrypted by using digital certificates
issued to users by the respective CA of their company. No other certificates must be trusted
between the organizations.
 Microsoft Word documents attached to email messages sent from Proseware to Fabrikam must
be protected.
 Privileges must be minimized, whenever possible.

###EndCaseStudy###

You need to recommend changes to the existing environment to meet the web server requirement.
Which two actions should you recommend? Each correct answer presents part of the solution.

A server named CA1 has the Active Directory Certificate Services server role installed and is configured as an

###BeginCaseStudy###
Topic 2, Proseware Inc
General Overview
Proseware Inc., is a manufacturing company that has 4,000 employees.
Proseware works with a trading partner named Fabrikam, Inc.
Physical Locations
Proseware has a main office and two branch offices. The main office is located in London. The branch
offices are located in Madrid and Berlin. Proseware has a sales department based in the London office
and a research department based in the Berlin office.
The offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Proseware rents space at a hosting company. All offices have a dedicated WAN link to the hosting
company. Web servers that are accessible from the Internet are located at the hosting company.
Active Directory
The Proseware network contains an Active Directory forest named proseware.com. The forest contains a
single domain. The forest functional level is Windows Server 2012.
Each office contains three domain controllers. An Active Directory site is configured for each office.
System state backups are performed every day on the domain controllers by using System Center 2012
R2 Data Protection Manager (DPM).
Virtualization
Proseware has Hyper-V hosts that run Windows Server 2012 R2. Each Hyper-V host manages eight to ten
virtual machines. The Hyper-V hosts are configured as shown in the following table.

All of the Hyper-V hosts store virtual machines on direct-attached storage (DAS).
Servers
All servers run Windows Server 2012 R2. All of the servers are virtualized, except for the Hyper-V hosts.
VDI1 and VDI2 use locally attached storage to host virtual hard disk (VHD) files. The VHDs use the .vhd
format.
A line-of-business application named SalesApp is used by the sales department and runs on a server
named APP1. APP1 is hosted on HyperV2.
A server named CA1 has the Active Directory Certificate Services server role installed and is configured
as an enterprise root certification authority (CA) named ProsewareCA.
Ten load-balanced web servers hosted on HyperV7 and HyperV8 run the Internet-facing web site that
takes orders from Internet customers.
System Center 2012 R2 Operations Manager is used to monitor the health of the servers on the network.
All of the servers are members of the proseware.com domain, except for the servers located in the
perimeter network.
Client Computers
All client computers run either Windows 8.1 or Windows 7. Some of the users in the London office
connect to pooled virtual desktops hosted on VDI1 and VDI2.
Problem Statements
Proseware identifies the following issues on the network:Virtualization administrators report that the load on the Hyper-V hosts is inconsistent. The virtualization
administrators also report that administrators fail to account for host utilization when creating new
virtual machines.
Users in the sales department report that they experience issues when they attempt to access SalesApp
from any other network than the one in the London office.
Sometimes, configuration changes are not duplicated properly across the web servers, resulting in
customer ordering issues. Web servers are regularly changed.
Demand for virtual desktops is increasing. Administrators report that storage space is becoming an issue
as they want to add more virtual machines.
In the past, some personally identifiable information (PII) was exposed when paper shredding
procedures were not followed.
Requirements
Planned Changes
Proseware plans to implement the following changes on the network:
 Implement a backup solution for Active Directory.
 Relocate the sales department to the Madrid office.
 Implement System Center 2012 R2 components, as required.
 Protect email attachments sent to Fabrikam that contain PII data so that the attachments
cannot be printed.
 Implement System Center 2012 R2 Virtual Machine Manager (VMM) to manage the virtual
machine infrastructure. Proseware does not plan to use private clouds in the near future.
 Deploy a new Hyper-V host named RESEARCH1 to the Berlin office. RESEARCH1 will be financed
by the research department. All of the virtual machines deployed to RESEARCH1 will use VMM
templates.
Technical Requirements
Proseware identifies the following virtualization requirements:
 The increased demand for virtual desktops must be met.
 Once System Center is deployed, all of the Hyper-V hosts must be managed by using VMM.
 If any of the Hyper-V hosts exceeds a set number of virtual machines, an administrator must be
notified by email.
 Network administrators in each location must be responsible for managing the Hyper-V hosts
in their respective location. The management of the hosts must be performed by using VMM. The network technicians in each office must be able to create virtual machines in their
respective office. The network technicians must be prevented from modifying the host server
settings.
 New virtual machines must be deployed to RESEARCH1 only if the virtual machine template
used to create the machine has a value specified for a custom property named CostCenter’ that
matches Research’.
The web site configurations must be identical on all web servers.
Security Requirements
Proseware identifies the following security requirements:
 All email messages sent to and from Fabrikam must be encrypted by using digital certificates
issued to users by the respective CA of their company. No other certificates must be trusted
between the organizations.
 Microsoft Word documents attached to email messages sent from Proseware to Fabrikam must
be protected.
 Privileges must be minimized, whenever possible.

###EndCaseStudy###

You are evaluating the use of VMM to migrate APP1 for the sales users. You need to identify the effects
of the migration.
What should you identify?

A server named CA1 has the Active Directory Certificate Services server role installed and is configured as an

###BeginCaseStudy###
Topic 2, Proseware Inc
General Overview
Proseware Inc., is a manufacturing company that has 4,000 employees.
Proseware works with a trading partner named Fabrikam, Inc.
Physical Locations
Proseware has a main office and two branch offices. The main office is located in London. The branch
offices are located in Madrid and Berlin. Proseware has a sales department based in the London office
and a research department based in the Berlin office.
The offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Proseware rents space at a hosting company. All offices have a dedicated WAN link to the hosting
company. Web servers that are accessible from the Internet are located at the hosting company.
Active Directory
The Proseware network contains an Active Directory forest named proseware.com. The forest contains a
single domain. The forest functional level is Windows Server 2012.
Each office contains three domain controllers. An Active Directory site is configured for each office.
System state backups are performed every day on the domain controllers by using System Center 2012
R2 Data Protection Manager (DPM).
Virtualization
Proseware has Hyper-V hosts that run Windows Server 2012 R2. Each Hyper-V host manages eight to ten
virtual machines. The Hyper-V hosts are configured as shown in the following table.

All of the Hyper-V hosts store virtual machines on direct-attached storage (DAS).
Servers
All servers run Windows Server 2012 R2. All of the servers are virtualized, except for the Hyper-V hosts.
VDI1 and VDI2 use locally attached storage to host virtual hard disk (VHD) files. The VHDs use the .vhd
format.
A line-of-business application named SalesApp is used by the sales department and runs on a server
named APP1. APP1 is hosted on HyperV2.
A server named CA1 has the Active Directory Certificate Services server role installed and is configured
as an enterprise root certification authority (CA) named ProsewareCA.
Ten load-balanced web servers hosted on HyperV7 and HyperV8 run the Internet-facing web site that
takes orders from Internet customers.
System Center 2012 R2 Operations Manager is used to monitor the health of the servers on the network.
All of the servers are members of the proseware.com domain, except for the servers located in the
perimeter network.
Client Computers
All client computers run either Windows 8.1 or Windows 7. Some of the users in the London office
connect to pooled virtual desktops hosted on VDI1 and VDI2.
Problem Statements
Proseware identifies the following issues on the network:Virtualization administrators report that the load on the Hyper-V hosts is inconsistent. The virtualization
administrators also report that administrators fail to account for host utilization when creating new
virtual machines.
Users in the sales department report that they experience issues when they attempt to access SalesApp
from any other network than the one in the London office.
Sometimes, configuration changes are not duplicated properly across the web servers, resulting in
customer ordering issues. Web servers are regularly changed.
Demand for virtual desktops is increasing. Administrators report that storage space is becoming an issue
as they want to add more virtual machines.
In the past, some personally identifiable information (PII) was exposed when paper shredding
procedures were not followed.
Requirements
Planned Changes
Proseware plans to implement the following changes on the network:
 Implement a backup solution for Active Directory.
 Relocate the sales department to the Madrid office.
 Implement System Center 2012 R2 components, as required.
 Protect email attachments sent to Fabrikam that contain PII data so that the attachments
cannot be printed.
 Implement System Center 2012 R2 Virtual Machine Manager (VMM) to manage the virtual
machine infrastructure. Proseware does not plan to use private clouds in the near future.
 Deploy a new Hyper-V host named RESEARCH1 to the Berlin office. RESEARCH1 will be financed
by the research department. All of the virtual machines deployed to RESEARCH1 will use VMM
templates.
Technical Requirements
Proseware identifies the following virtualization requirements:
 The increased demand for virtual desktops must be met.
 Once System Center is deployed, all of the Hyper-V hosts must be managed by using VMM.
 If any of the Hyper-V hosts exceeds a set number of virtual machines, an administrator must be
notified by email.
 Network administrators in each location must be responsible for managing the Hyper-V hosts
in their respective location. The management of the hosts must be performed by using VMM. The network technicians in each office must be able to create virtual machines in their
respective office. The network technicians must be prevented from modifying the host server
settings.
 New virtual machines must be deployed to RESEARCH1 only if the virtual machine template
used to create the machine has a value specified for a custom property named CostCenter’ that
matches Research’.
The web site configurations must be identical on all web servers.
Security Requirements
Proseware identifies the following security requirements:
 All email messages sent to and from Fabrikam must be encrypted by using digital certificates
issued to users by the respective CA of their company. No other certificates must be trusted
between the organizations.
 Microsoft Word documents attached to email messages sent from Proseware to Fabrikam must
be protected.
 Privileges must be minimized, whenever possible.

###EndCaseStudy###

You need to recommend changes to the existing environment to meet the PII requirement.
What should you recommend?

A server named CA1 has the Active Directory Certificate Services server role installed and is configured as an

###BeginCaseStudy###
Topic 2, Proseware Inc
General Overview
Proseware Inc., is a manufacturing company that has 4,000 employees.
Proseware works with a trading partner named Fabrikam, Inc.
Physical Locations
Proseware has a main office and two branch offices. The main office is located in London. The branch
offices are located in Madrid and Berlin. Proseware has a sales department based in the London office
and a research department based in the Berlin office.
The offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Proseware rents space at a hosting company. All offices have a dedicated WAN link to the hosting
company. Web servers that are accessible from the Internet are located at the hosting company.
Active Directory
The Proseware network contains an Active Directory forest named proseware.com. The forest contains a
single domain. The forest functional level is Windows Server 2012.
Each office contains three domain controllers. An Active Directory site is configured for each office.
System state backups are performed every day on the domain controllers by using System Center 2012
R2 Data Protection Manager (DPM).
Virtualization
Proseware has Hyper-V hosts that run Windows Server 2012 R2. Each Hyper-V host manages eight to ten
virtual machines. The Hyper-V hosts are configured as shown in the following table.

All of the Hyper-V hosts store virtual machines on direct-attached storage (DAS).
Servers
All servers run Windows Server 2012 R2. All of the servers are virtualized, except for the Hyper-V hosts.
VDI1 and VDI2 use locally attached storage to host virtual hard disk (VHD) files. The VHDs use the .vhd
format.
A line-of-business application named SalesApp is used by the sales department and runs on a server
named APP1. APP1 is hosted on HyperV2.
A server named CA1 has the Active Directory Certificate Services server role installed and is configured
as an enterprise root certification authority (CA) named ProsewareCA.
Ten load-balanced web servers hosted on HyperV7 and HyperV8 run the Internet-facing web site that
takes orders from Internet customers.
System Center 2012 R2 Operations Manager is used to monitor the health of the servers on the network.
All of the servers are members of the proseware.com domain, except for the servers located in the
perimeter network.
Client Computers
All client computers run either Windows 8.1 or Windows 7. Some of the users in the London office
connect to pooled virtual desktops hosted on VDI1 and VDI2.
Problem Statements
Proseware identifies the following issues on the network:Virtualization administrators report that the load on the Hyper-V hosts is inconsistent. The virtualization
administrators also report that administrators fail to account for host utilization when creating new
virtual machines.
Users in the sales department report that they experience issues when they attempt to access SalesApp
from any other network than the one in the London office.
Sometimes, configuration changes are not duplicated properly across the web servers, resulting in
customer ordering issues. Web servers are regularly changed.
Demand for virtual desktops is increasing. Administrators report that storage space is becoming an issue
as they want to add more virtual machines.
In the past, some personally identifiable information (PII) was exposed when paper shredding
procedures were not followed.
Requirements
Planned Changes
Proseware plans to implement the following changes on the network:
 Implement a backup solution for Active Directory.
 Relocate the sales department to the Madrid office.
 Implement System Center 2012 R2 components, as required.
 Protect email attachments sent to Fabrikam that contain PII data so that the attachments
cannot be printed.
 Implement System Center 2012 R2 Virtual Machine Manager (VMM) to manage the virtual
machine infrastructure. Proseware does not plan to use private clouds in the near future.
 Deploy a new Hyper-V host named RESEARCH1 to the Berlin office. RESEARCH1 will be financed
by the research department. All of the virtual machines deployed to RESEARCH1 will use VMM
templates.
Technical Requirements
Proseware identifies the following virtualization requirements:
 The increased demand for virtual desktops must be met.
 Once System Center is deployed, all of the Hyper-V hosts must be managed by using VMM.
 If any of the Hyper-V hosts exceeds a set number of virtual machines, an administrator must be
notified by email.
 Network administrators in each location must be responsible for managing the Hyper-V hosts
in their respective location. The management of the hosts must be performed by using VMM. The network technicians in each office must be able to create virtual machines in their
respective office. The network technicians must be prevented from modifying the host server
settings.
 New virtual machines must be deployed to RESEARCH1 only if the virtual machine template
used to create the machine has a value specified for a custom property named CostCenter’ that
matches Research’.
The web site configurations must be identical on all web servers.
Security Requirements
Proseware identifies the following security requirements:
 All email messages sent to and from Fabrikam must be encrypted by using digital certificates
issued to users by the respective CA of their company. No other certificates must be trusted
between the organizations.
 Microsoft Word documents attached to email messages sent from Proseware to Fabrikam must
be protected.
 Privileges must be minimized, whenever possible.

###EndCaseStudy###

You need to ensure that RESEARCH1 only contains the required virtual machines.
What should you do?


Page 2 of 2512345...1020...Last »