Which four actions should you recommend performing in s…
###BeginCaseStudy###
Testlet 1
Overview
Fabrikam, Inc. is an IT services and hosting provider.
Fabrikam has two main data centers. The data centers are located in New York and Montreal. The data centers
connect to each other by using high-bandwidth, low latency WAN links. Each data center connects directly to
the Internet.
Existing Environment
The network contains an Active Directory forest named fabrikam.com that is dedicated to hosting services. All
of the servers in the forest run Windows Server 2012 R2.
The network contains a System Center 2012 R2 infrastructure that includes the following components:
Windows Azure Pack for Windows Server
Virtual Machine Manager (VMM)
Service Provider Foundation
Operations Manager
Orchestrator
Fabrikam has implemented Hyper-V Network Virtualization in the hosting environment.
All storage is either SAN-based or direct-attached storage (DAS). All VMM library servers use DAS storage.
None of the VMM library servers are managed as VMM Hyper-V hosts.
Each Hyper-V host has four 10-GbE network adapters.
Requirements
Business Goals
Fabrikam plans to provide hosting services to two customers named Customer1 and Customer2. Customer1 is
based in New York and Customer2 is based in Montreal. IT services will include assistance managing the
services in the following table.
The internal network of Customer1 contains a System Center 2012 R2 infrastructure that includes the following
components:
Operations Manager
App Controller
VMM
Customer1 plans to deploy multi-tier VMM services that run Internet Information Services (IIS), .NET
applications, and Microsoft SQL Server. Customer1 plans to deploy non-clustered virtual machines only.
Planned Changes
Fabrikam plans to implement the following changes to the network:
Deploy a Remote Desktop Gateway (RD Gateway) virtual machine.
Replace the SAN by using iSCSI targets on servers that run Windows Server 2012 R2.
General Requirements
Fabrikam identifies the following requirements for the planned deployment:
Hyper-V hosts must remain available if a single network adapter fails. You must be able to control the
amount of bandwidth allocated to iSCSI traffic and Failover Clustering redirected traffic.Virtual machines that run in the Fabrikam data centers must remain available if a single data center fails.
The recovery point objective (RPO) must be 30 seconds.
The IT staff at Fabrikam must be able to mount iSCSI target logical units on Hyper-V hosts directly from the
Virtual Machine Manager console.
Hyper-V management and storage traffic must be separated from the network traffic generated by virtual
machine guests.
Virtual machines must be deployed by using a SAN copy.
If a site fails, a failover must be invoked manually.
Customer1 Requirements
Fabrikam identifies the following requirements for Customer1:
Customer1 will use Hyper-V Network Virtualization in its hosted environment.
Customer1 will require the ability to manage all of its cloud services from a single interface.
Each deployment of a virtual machine for Customer1 must trigger the execution of a runbook by using the
Orchestrator web service. The runbook must execute before any user account logs on to the virtual
machine.
Customer2 Requirements
Fabrikam identifies the following requirements for Customer2:
Customer2 must be able to connect to the console of the hosted virtual machines.
All of the metadata for any of the virtual machines of Customer1 must not be stored in Windows Azure.
###EndCaseStudy###
DRAG DROP
You need to recommend a solution for the management of the iSCSI storage.
Which four actions should you recommend performing in sequence? To answer, move the appropriate actions
from the list of actions to the answer area and arrange them in the correct order.
Select and Place:
What is the best approach to achieve the goal?
###BeginCaseStudy###
Testlet 1
Overview
Fabrikam, Inc. is an IT services and hosting provider.
Fabrikam has two main data centers. The data centers are located in New York and Montreal. The data centers
connect to each other by using high-bandwidth, low latency WAN links. Each data center connects directly to
the Internet.
Existing Environment
The network contains an Active Directory forest named fabrikam.com that is dedicated to hosting services. All
of the servers in the forest run Windows Server 2012 R2.
The network contains a System Center 2012 R2 infrastructure that includes the following components:
Windows Azure Pack for Windows Server
Virtual Machine Manager (VMM)
Service Provider Foundation
Operations Manager
Orchestrator
Fabrikam has implemented Hyper-V Network Virtualization in the hosting environment.
All storage is either SAN-based or direct-attached storage (DAS). All VMM library servers use DAS storage.
None of the VMM library servers are managed as VMM Hyper-V hosts.
Each Hyper-V host has four 10-GbE network adapters.
Requirements
Business Goals
Fabrikam plans to provide hosting services to two customers named Customer1 and Customer2. Customer1 is
based in New York and Customer2 is based in Montreal. IT services will include assistance managing the
services in the following table.
The internal network of Customer1 contains a System Center 2012 R2 infrastructure that includes the following
components:
Operations Manager
App Controller
VMM
Customer1 plans to deploy multi-tier VMM services that run Internet Information Services (IIS), .NET
applications, and Microsoft SQL Server. Customer1 plans to deploy non-clustered virtual machines only.
Planned Changes
Fabrikam plans to implement the following changes to the network:
Deploy a Remote Desktop Gateway (RD Gateway) virtual machine.
Replace the SAN by using iSCSI targets on servers that run Windows Server 2012 R2.
General Requirements
Fabrikam identifies the following requirements for the planned deployment:
Hyper-V hosts must remain available if a single network adapter fails. You must be able to control the
amount of bandwidth allocated to iSCSI traffic and Failover Clustering redirected traffic.Virtual machines that run in the Fabrikam data centers must remain available if a single data center fails.
The recovery point objective (RPO) must be 30 seconds.
The IT staff at Fabrikam must be able to mount iSCSI target logical units on Hyper-V hosts directly from the
Virtual Machine Manager console.
Hyper-V management and storage traffic must be separated from the network traffic generated by virtual
machine guests.
Virtual machines must be deployed by using a SAN copy.
If a site fails, a failover must be invoked manually.
Customer1 Requirements
Fabrikam identifies the following requirements for Customer1:
Customer1 will use Hyper-V Network Virtualization in its hosted environment.
Customer1 will require the ability to manage all of its cloud services from a single interface.
Each deployment of a virtual machine for Customer1 must trigger the execution of a runbook by using the
Orchestrator web service. The runbook must execute before any user account logs on to the virtual
machine.
Customer2 Requirements
Fabrikam identifies the following requirements for Customer2:
Customer2 must be able to connect to the console of the hosted virtual machines.
All of the metadata for any of the virtual machines of Customer1 must not be stored in Windows Azure.
###EndCaseStudy###
You need to implement a solution that meets the resiliency requirements of the customers.
What is the best approach to achieve the goal? More than one answer choice may achieve the goal. Select the
BEST answer.
Which four cmdlets should you run in sequence?
###BeginCaseStudy###
Testlet 1
Overview
Fabrikam, Inc. is an IT services and hosting provider.
Fabrikam has two main data centers. The data centers are located in New York and Montreal. The data centers
connect to each other by using high-bandwidth, low latency WAN links. Each data center connects directly to
the Internet.
Existing Environment
The network contains an Active Directory forest named fabrikam.com that is dedicated to hosting services. All
of the servers in the forest run Windows Server 2012 R2.
The network contains a System Center 2012 R2 infrastructure that includes the following components:
Windows Azure Pack for Windows Server
Virtual Machine Manager (VMM)
Service Provider Foundation
Operations Manager
Orchestrator
Fabrikam has implemented Hyper-V Network Virtualization in the hosting environment.
All storage is either SAN-based or direct-attached storage (DAS). All VMM library servers use DAS storage.
None of the VMM library servers are managed as VMM Hyper-V hosts.
Each Hyper-V host has four 10-GbE network adapters.
Requirements
Business Goals
Fabrikam plans to provide hosting services to two customers named Customer1 and Customer2. Customer1 is
based in New York and Customer2 is based in Montreal. IT services will include assistance managing the
services in the following table.
The internal network of Customer1 contains a System Center 2012 R2 infrastructure that includes the following
components:
Operations Manager
App Controller
VMM
Customer1 plans to deploy multi-tier VMM services that run Internet Information Services (IIS), .NET
applications, and Microsoft SQL Server. Customer1 plans to deploy non-clustered virtual machines only.
Planned Changes
Fabrikam plans to implement the following changes to the network:
Deploy a Remote Desktop Gateway (RD Gateway) virtual machine.
Replace the SAN by using iSCSI targets on servers that run Windows Server 2012 R2.
General Requirements
Fabrikam identifies the following requirements for the planned deployment:
Hyper-V hosts must remain available if a single network adapter fails. You must be able to control the
amount of bandwidth allocated to iSCSI traffic and Failover Clustering redirected traffic.Virtual machines that run in the Fabrikam data centers must remain available if a single data center fails.
The recovery point objective (RPO) must be 30 seconds.
The IT staff at Fabrikam must be able to mount iSCSI target logical units on Hyper-V hosts directly from the
Virtual Machine Manager console.
Hyper-V management and storage traffic must be separated from the network traffic generated by virtual
machine guests.
Virtual machines must be deployed by using a SAN copy.
If a site fails, a failover must be invoked manually.
Customer1 Requirements
Fabrikam identifies the following requirements for Customer1:
Customer1 will use Hyper-V Network Virtualization in its hosted environment.
Customer1 will require the ability to manage all of its cloud services from a single interface.
Each deployment of a virtual machine for Customer1 must trigger the execution of a runbook by using the
Orchestrator web service. The runbook must execute before any user account logs on to the virtual
machine.
Customer2 Requirements
Fabrikam identifies the following requirements for Customer2:
Customer2 must be able to connect to the console of the hosted virtual machines.
All of the metadata for any of the virtual machines of Customer1 must not be stored in Windows Azure.
###EndCaseStudy###
DRAG DROP
You need to implement the resiliency requirements for the Hyper-V hosts.
Which four cmdlets should you run in sequence? To answer, move the appropriate cmdlets from the list of
cmdlets to the answer area and arrange them in the correct order.
Select and Place:
Hot Area:
###BeginCaseStudy###
Testlet 1
Overview
Fabrikam, Inc. is an IT services and hosting provider.
Fabrikam has two main data centers. The data centers are located in New York and Montreal. The data centers
connect to each other by using high-bandwidth, low latency WAN links. Each data center connects directly to
the Internet.
Existing Environment
The network contains an Active Directory forest named fabrikam.com that is dedicated to hosting services. All
of the servers in the forest run Windows Server 2012 R2.
The network contains a System Center 2012 R2 infrastructure that includes the following components:
Windows Azure Pack for Windows Server
Virtual Machine Manager (VMM)
Service Provider Foundation
Operations Manager
Orchestrator
Fabrikam has implemented Hyper-V Network Virtualization in the hosting environment.
All storage is either SAN-based or direct-attached storage (DAS). All VMM library servers use DAS storage.
None of the VMM library servers are managed as VMM Hyper-V hosts.
Each Hyper-V host has four 10-GbE network adapters.
Requirements
Business Goals
Fabrikam plans to provide hosting services to two customers named Customer1 and Customer2. Customer1 is
based in New York and Customer2 is based in Montreal. IT services will include assistance managing the
services in the following table.
The internal network of Customer1 contains a System Center 2012 R2 infrastructure that includes the following
components:
Operations Manager
App Controller
VMM
Customer1 plans to deploy multi-tier VMM services that run Internet Information Services (IIS), .NET
applications, and Microsoft SQL Server. Customer1 plans to deploy non-clustered virtual machines only.
Planned Changes
Fabrikam plans to implement the following changes to the network:
Deploy a Remote Desktop Gateway (RD Gateway) virtual machine.
Replace the SAN by using iSCSI targets on servers that run Windows Server 2012 R2.
General Requirements
Fabrikam identifies the following requirements for the planned deployment:
Hyper-V hosts must remain available if a single network adapter fails. You must be able to control the
amount of bandwidth allocated to iSCSI traffic and Failover Clustering redirected traffic.Virtual machines that run in the Fabrikam data centers must remain available if a single data center fails.
The recovery point objective (RPO) must be 30 seconds.
The IT staff at Fabrikam must be able to mount iSCSI target logical units on Hyper-V hosts directly from the
Virtual Machine Manager console.
Hyper-V management and storage traffic must be separated from the network traffic generated by virtual
machine guests.
Virtual machines must be deployed by using a SAN copy.
If a site fails, a failover must be invoked manually.
Customer1 Requirements
Fabrikam identifies the following requirements for Customer1:
Customer1 will use Hyper-V Network Virtualization in its hosted environment.
Customer1 will require the ability to manage all of its cloud services from a single interface.
Each deployment of a virtual machine for Customer1 must trigger the execution of a runbook by using the
Orchestrator web service. The runbook must execute before any user account logs on to the virtual
machine.
Customer2 Requirements
Fabrikam identifies the following requirements for Customer2:
Customer2 must be able to connect to the console of the hosted virtual machines.
All of the metadata for any of the virtual machines of Customer1 must not be stored in Windows Azure.
###EndCaseStudy###
HOTSPOT
You create a virtual machine template that has the following properties:
Use the drop-down menus to select the answer choice that completes each statement.
Hot Area:
What should you recommend?
###BeginCaseStudy###
Testlet 1
Overview
Proseware, Inc. is an international publishing company.
Proseware has four data centers and 80 offices. The data centers are located in Dallas, Dublin, Bangalore, and
Sydney. The offices are located worldwide.
Existing Environment
Network Infrastructure
The network contains a single-domain Active Directory forest named proseware.com.
Each server has a Baseboard Management Controller (BMC) installed.
Database administrators in the Bangalore data center manage all of the SQL Server servers in the data
centers.
Dublin Data Center
The Dublin data center contains two servers. The servers are configured as shown in the following table.
Operations Manager 2007 R2 agents are installed on all of the servers in the Dublin data center by using the
push installation method.
App1
Proseware uses a critical business application named Appl. Multiple instances of App1 are deployed to each
data center.
Each instance of App1 consists of the following physical servers that run Windows Server 2012:
A database server that runs SQL Server 2008 R2.
Two web servers that are load balanced by using the Network Load Balancing (NLB) feature. Each web
server has a single network adapter.
New versions of App1 are released at least four times a year.
When a new version of App1 is released, all of the servers in App1 must be redeployed.
Requirements
Planned Changes
Proseware plans to deploy all System Center 2012 components.
Proseware plans to implement the following changes in each data center:
Deploy a SQL Server 2008 R2 Enterprise failover cluster.Store all virtual machine data in a Fibre Channel SAN infrastructure.
Deploy a highly available Virtual Machine Manager (VMM) environment.
Deploy one physical server that has Data Protection Manager (DPM) deployed.
Technical Requirements
Proseware identifies the following technical requirements for the implementation of a private cloud:
All Hyper-V hosts must be added to a failover cluster automatically.
The deployment of Hyper-V hosts to each data center must be automated.
The implementation of the DPM infrastructure must meet the following requirements:
– Backups will be stored on an iSCSI SAN.
– Virtual machines in a running state must be backed up from their respective host. Administrators must be
able to restore individual files from host backups on virtual machines configured as file servers.
The implementation of the Operations Manager 2012 infrastructure must meet the following requirements:
– Operations Manager monitoring must not be affected if a single server fails.
– Existing data must be retained in the Operations Manager 2012 infrastructure.
– Existing agents must continue to report to Operations Manager during the upgrade process.
– All Operations Manager agents must report to a local management server in their respective data center.
– The service desk in the Dublin data center must be able to view the status of the servers in all of the data
centers.
Administrative Requirements
Proseware identifies the following administrative requirements:
An administrator must be notified when an error occurs on a server.
An administrator must be able to assign errors to specific administrators for resolution.
Errors that remain unresolved for more than 10 hours must be escalated automatically to another
administrator.
Planned Virtual Machines
The servers in each instance of App1 will be replaced with a set of virtual machines. The planned changes
must meet the following requirements:
Each instance must be redeployed when a new version of App1 is released.
Each instance of App1 must be installed by using the minimum amount of administrative effort.
App2
An application named App2 is hosted on the virtual machines in a Windows Azure public cloud infrastructure.
The performance and availability of the components of App2 must be monitored centrally. Administrators must
be able to modify the configurations of the App2 components.
App3
A service template will be used to deploy multiple instances of a multi-tier application named App3. The vendor
of App3 will provide updates to App3 every two months.
SQL Server Deployment Requirements
VMM administrators plan to deploy many virtual machines that have SQL Server deployed. The administrators
identify the following deployment options for the virtual machines:
The virtual machines will host databases that will be created by using data-tier application (DAC) packages.
The virtual machines will have SQL Server 2008 R2 Standard deployed by using one of six different
configurations.
The operating system for the virtual machines will be either Windows Server 2008 R2 Enterprise or
Windows Server 2008 R2 Standard.
###EndCaseStudy###
You need to recommend which configurations must be performed to meet the backup requirements for HyperV.
What should you recommend? (More than one answer choice may achieve the goal. Select the BEST answer.)
What should you recommend?
###BeginCaseStudy###
Testlet 1
Overview
Proseware, Inc. is an international publishing company.
Proseware has four data centers and 80 offices. The data centers are located in Dallas, Dublin, Bangalore, and
Sydney. The offices are located worldwide.
Existing Environment
Network Infrastructure
The network contains a single-domain Active Directory forest named proseware.com.
Each server has a Baseboard Management Controller (BMC) installed.
Database administrators in the Bangalore data center manage all of the SQL Server servers in the data
centers.
Dublin Data Center
The Dublin data center contains two servers. The servers are configured as shown in the following table.
Operations Manager 2007 R2 agents are installed on all of the servers in the Dublin data center by using the
push installation method.
App1
Proseware uses a critical business application named Appl. Multiple instances of App1 are deployed to each
data center.
Each instance of App1 consists of the following physical servers that run Windows Server 2012:
A database server that runs SQL Server 2008 R2.
Two web servers that are load balanced by using the Network Load Balancing (NLB) feature. Each web
server has a single network adapter.
New versions of App1 are released at least four times a year.
When a new version of App1 is released, all of the servers in App1 must be redeployed.
Requirements
Planned Changes
Proseware plans to deploy all System Center 2012 components.
Proseware plans to implement the following changes in each data center:
Deploy a SQL Server 2008 R2 Enterprise failover cluster.Store all virtual machine data in a Fibre Channel SAN infrastructure.
Deploy a highly available Virtual Machine Manager (VMM) environment.
Deploy one physical server that has Data Protection Manager (DPM) deployed.
Technical Requirements
Proseware identifies the following technical requirements for the implementation of a private cloud:
All Hyper-V hosts must be added to a failover cluster automatically.
The deployment of Hyper-V hosts to each data center must be automated.
The implementation of the DPM infrastructure must meet the following requirements:
– Backups will be stored on an iSCSI SAN.
– Virtual machines in a running state must be backed up from their respective host. Administrators must be
able to restore individual files from host backups on virtual machines configured as file servers.
The implementation of the Operations Manager 2012 infrastructure must meet the following requirements:
– Operations Manager monitoring must not be affected if a single server fails.
– Existing data must be retained in the Operations Manager 2012 infrastructure.
– Existing agents must continue to report to Operations Manager during the upgrade process.
– All Operations Manager agents must report to a local management server in their respective data center.
– The service desk in the Dublin data center must be able to view the status of the servers in all of the data
centers.
Administrative Requirements
Proseware identifies the following administrative requirements:
An administrator must be notified when an error occurs on a server.
An administrator must be able to assign errors to specific administrators for resolution.
Errors that remain unresolved for more than 10 hours must be escalated automatically to another
administrator.
Planned Virtual Machines
The servers in each instance of App1 will be replaced with a set of virtual machines. The planned changes
must meet the following requirements:
Each instance must be redeployed when a new version of App1 is released.
Each instance of App1 must be installed by using the minimum amount of administrative effort.
App2
An application named App2 is hosted on the virtual machines in a Windows Azure public cloud infrastructure.
The performance and availability of the components of App2 must be monitored centrally. Administrators must
be able to modify the configurations of the App2 components.
App3
A service template will be used to deploy multiple instances of a multi-tier application named App3. The vendor
of App3 will provide updates to App3 every two months.
SQL Server Deployment Requirements
VMM administrators plan to deploy many virtual machines that have SQL Server deployed. The administrators
identify the following deployment options for the virtual machines:
The virtual machines will host databases that will be created by using data-tier application (DAC) packages.
The virtual machines will have SQL Server 2008 R2 Standard deployed by using one of six different
configurations.
The operating system for the virtual machines will be either Windows Server 2008 R2 Enterprise or
Windows Server 2008 R2 Standard.
###EndCaseStudy###
You need to recommend a solution to install updates for App3 once App3 is deployed.
What should you recommend? (More than one answer choice may achieve the goal. Select the BEST answer.)
What should you identify?
###BeginCaseStudy###
Testlet 1
Overview
Proseware, Inc. is an international publishing company.
Proseware has four data centers and 80 offices. The data centers are located in Dallas, Dublin, Bangalore, and
Sydney. The offices are located worldwide.
Existing Environment
Network Infrastructure
The network contains a single-domain Active Directory forest named proseware.com.
Each server has a Baseboard Management Controller (BMC) installed.
Database administrators in the Bangalore data center manage all of the SQL Server servers in the data
centers.
Dublin Data Center
The Dublin data center contains two servers. The servers are configured as shown in the following table.
Operations Manager 2007 R2 agents are installed on all of the servers in the Dublin data center by using the
push installation method.
App1
Proseware uses a critical business application named Appl. Multiple instances of App1 are deployed to each
data center.
Each instance of App1 consists of the following physical servers that run Windows Server 2012:
A database server that runs SQL Server 2008 R2.
Two web servers that are load balanced by using the Network Load Balancing (NLB) feature. Each web
server has a single network adapter.
New versions of App1 are released at least four times a year.
When a new version of App1 is released, all of the servers in App1 must be redeployed.
Requirements
Planned Changes
Proseware plans to deploy all System Center 2012 components.
Proseware plans to implement the following changes in each data center:
Deploy a SQL Server 2008 R2 Enterprise failover cluster.Store all virtual machine data in a Fibre Channel SAN infrastructure.
Deploy a highly available Virtual Machine Manager (VMM) environment.
Deploy one physical server that has Data Protection Manager (DPM) deployed.
Technical Requirements
Proseware identifies the following technical requirements for the implementation of a private cloud:
All Hyper-V hosts must be added to a failover cluster automatically.
The deployment of Hyper-V hosts to each data center must be automated.
The implementation of the DPM infrastructure must meet the following requirements:
– Backups will be stored on an iSCSI SAN.
– Virtual machines in a running state must be backed up from their respective host. Administrators must be
able to restore individual files from host backups on virtual machines configured as file servers.
The implementation of the Operations Manager 2012 infrastructure must meet the following requirements:
– Operations Manager monitoring must not be affected if a single server fails.
– Existing data must be retained in the Operations Manager 2012 infrastructure.
– Existing agents must continue to report to Operations Manager during the upgrade process.
– All Operations Manager agents must report to a local management server in their respective data center.
– The service desk in the Dublin data center must be able to view the status of the servers in all of the data
centers.
Administrative Requirements
Proseware identifies the following administrative requirements:
An administrator must be notified when an error occurs on a server.
An administrator must be able to assign errors to specific administrators for resolution.
Errors that remain unresolved for more than 10 hours must be escalated automatically to another
administrator.
Planned Virtual Machines
The servers in each instance of App1 will be replaced with a set of virtual machines. The planned changes
must meet the following requirements:
Each instance must be redeployed when a new version of App1 is released.
Each instance of App1 must be installed by using the minimum amount of administrative effort.
App2
An application named App2 is hosted on the virtual machines in a Windows Azure public cloud infrastructure.
The performance and availability of the components of App2 must be monitored centrally. Administrators must
be able to modify the configurations of the App2 components.
App3
A service template will be used to deploy multiple instances of a multi-tier application named App3. The vendor
of App3 will provide updates to App3 every two months.
SQL Server Deployment Requirements
VMM administrators plan to deploy many virtual machines that have SQL Server deployed. The administrators
identify the following deployment options for the virtual machines:
The virtual machines will host databases that will be created by using data-tier application (DAC) packages.
The virtual machines will have SQL Server 2008 R2 Standard deployed by using one of six different
configurations.
The operating system for the virtual machines will be either Windows Server 2008 R2 Enterprise or
Windows Server 2008 R2 Standard.
###EndCaseStudy###
HOTSPOT
You are planning to create templates for the deployment of SQL Server.You need to identify the minimum number of SQL Server profiles and application profiles required to meet the
SQL Server deployment requirements. The solution must minimize the amount of administrative effort required
to create the virtual machine templates for the planned deployment.
What should you identify? (To answer, select the appropriate number of SQL Server profiles and application
profiles in the answer area.)
Hot Area:
Which System Center 2012 product should you include in …
###BeginCaseStudy###
Testlet 1
Overview
Proseware, Inc. is an international publishing company.
Proseware has four data centers and 80 offices. The data centers are located in Dallas, Dublin, Bangalore, and
Sydney. The offices are located worldwide.
Existing Environment
Network Infrastructure
The network contains a single-domain Active Directory forest named proseware.com.
Each server has a Baseboard Management Controller (BMC) installed.
Database administrators in the Bangalore data center manage all of the SQL Server servers in the data
centers.
Dublin Data Center
The Dublin data center contains two servers. The servers are configured as shown in the following table.
Operations Manager 2007 R2 agents are installed on all of the servers in the Dublin data center by using the
push installation method.
App1
Proseware uses a critical business application named Appl. Multiple instances of App1 are deployed to each
data center.
Each instance of App1 consists of the following physical servers that run Windows Server 2012:
A database server that runs SQL Server 2008 R2.
Two web servers that are load balanced by using the Network Load Balancing (NLB) feature. Each web
server has a single network adapter.
New versions of App1 are released at least four times a year.
When a new version of App1 is released, all of the servers in App1 must be redeployed.
Requirements
Planned Changes
Proseware plans to deploy all System Center 2012 components.
Proseware plans to implement the following changes in each data center:
Deploy a SQL Server 2008 R2 Enterprise failover cluster.Store all virtual machine data in a Fibre Channel SAN infrastructure.
Deploy a highly available Virtual Machine Manager (VMM) environment.
Deploy one physical server that has Data Protection Manager (DPM) deployed.
Technical Requirements
Proseware identifies the following technical requirements for the implementation of a private cloud:
All Hyper-V hosts must be added to a failover cluster automatically.
The deployment of Hyper-V hosts to each data center must be automated.
The implementation of the DPM infrastructure must meet the following requirements:
– Backups will be stored on an iSCSI SAN.
– Virtual machines in a running state must be backed up from their respective host. Administrators must be
able to restore individual files from host backups on virtual machines configured as file servers.
The implementation of the Operations Manager 2012 infrastructure must meet the following requirements:
– Operations Manager monitoring must not be affected if a single server fails.
– Existing data must be retained in the Operations Manager 2012 infrastructure.
– Existing agents must continue to report to Operations Manager during the upgrade process.
– All Operations Manager agents must report to a local management server in their respective data center.
– The service desk in the Dublin data center must be able to view the status of the servers in all of the data
centers.
Administrative Requirements
Proseware identifies the following administrative requirements:
An administrator must be notified when an error occurs on a server.
An administrator must be able to assign errors to specific administrators for resolution.
Errors that remain unresolved for more than 10 hours must be escalated automatically to another
administrator.
Planned Virtual Machines
The servers in each instance of App1 will be replaced with a set of virtual machines. The planned changes
must meet the following requirements:
Each instance must be redeployed when a new version of App1 is released.
Each instance of App1 must be installed by using the minimum amount of administrative effort.
App2
An application named App2 is hosted on the virtual machines in a Windows Azure public cloud infrastructure.
The performance and availability of the components of App2 must be monitored centrally. Administrators must
be able to modify the configurations of the App2 components.
App3
A service template will be used to deploy multiple instances of a multi-tier application named App3. The vendor
of App3 will provide updates to App3 every two months.
SQL Server Deployment Requirements
VMM administrators plan to deploy many virtual machines that have SQL Server deployed. The administrators
identify the following deployment options for the virtual machines:
The virtual machines will host databases that will be created by using data-tier application (DAC) packages.
The virtual machines will have SQL Server 2008 R2 Standard deployed by using one of six different
configurations.
The operating system for the virtual machines will be either Windows Server 2008 R2 Enterprise or
Windows Server 2008 R2 Standard.
###EndCaseStudy###
You need to recommend a solution to deploy the Hyper-V hosts. The solution must meet the technical
requirements.
Which System Center 2012 product should you include in the recommendation? (More than one answer choice
may achieve the goal. Select the BEST answer.)
Where should you deploy each VMM management server?
###BeginCaseStudy###
Testlet 1
Overview
Proseware, Inc. is an international publishing company.
Proseware has four data centers and 80 offices. The data centers are located in Dallas, Dublin, Bangalore, and
Sydney. The offices are located worldwide.
Existing Environment
Network Infrastructure
The network contains a single-domain Active Directory forest named proseware.com.
Each server has a Baseboard Management Controller (BMC) installed.
Database administrators in the Bangalore data center manage all of the SQL Server servers in the data
centers.
Dublin Data Center
The Dublin data center contains two servers. The servers are configured as shown in the following table.
Operations Manager 2007 R2 agents are installed on all of the servers in the Dublin data center by using the
push installation method.
App1
Proseware uses a critical business application named Appl. Multiple instances of App1 are deployed to each
data center.
Each instance of App1 consists of the following physical servers that run Windows Server 2012:
A database server that runs SQL Server 2008 R2.
Two web servers that are load balanced by using the Network Load Balancing (NLB) feature. Each web
server has a single network adapter.
New versions of App1 are released at least four times a year.
When a new version of App1 is released, all of the servers in App1 must be redeployed.
Requirements
Planned Changes
Proseware plans to deploy all System Center 2012 components.
Proseware plans to implement the following changes in each data center:
Deploy a SQL Server 2008 R2 Enterprise failover cluster.Store all virtual machine data in a Fibre Channel SAN infrastructure.
Deploy a highly available Virtual Machine Manager (VMM) environment.
Deploy one physical server that has Data Protection Manager (DPM) deployed.
Technical Requirements
Proseware identifies the following technical requirements for the implementation of a private cloud:
All Hyper-V hosts must be added to a failover cluster automatically.
The deployment of Hyper-V hosts to each data center must be automated.
The implementation of the DPM infrastructure must meet the following requirements:
– Backups will be stored on an iSCSI SAN.
– Virtual machines in a running state must be backed up from their respective host. Administrators must be
able to restore individual files from host backups on virtual machines configured as file servers.
The implementation of the Operations Manager 2012 infrastructure must meet the following requirements:
– Operations Manager monitoring must not be affected if a single server fails.
– Existing data must be retained in the Operations Manager 2012 infrastructure.
– Existing agents must continue to report to Operations Manager during the upgrade process.
– All Operations Manager agents must report to a local management server in their respective data center.
– The service desk in the Dublin data center must be able to view the status of the servers in all of the data
centers.
Administrative Requirements
Proseware identifies the following administrative requirements:
An administrator must be notified when an error occurs on a server.
An administrator must be able to assign errors to specific administrators for resolution.
Errors that remain unresolved for more than 10 hours must be escalated automatically to another
administrator.
Planned Virtual Machines
The servers in each instance of App1 will be replaced with a set of virtual machines. The planned changes
must meet the following requirements:
Each instance must be redeployed when a new version of App1 is released.
Each instance of App1 must be installed by using the minimum amount of administrative effort.
App2
An application named App2 is hosted on the virtual machines in a Windows Azure public cloud infrastructure.
The performance and availability of the components of App2 must be monitored centrally. Administrators must
be able to modify the configurations of the App2 components.
App3
A service template will be used to deploy multiple instances of a multi-tier application named App3. The vendor
of App3 will provide updates to App3 every two months.
SQL Server Deployment Requirements
VMM administrators plan to deploy many virtual machines that have SQL Server deployed. The administrators
identify the following deployment options for the virtual machines:
The virtual machines will host databases that will be created by using data-tier application (DAC) packages.
The virtual machines will have SQL Server 2008 R2 Standard deployed by using one of six different
configurations.
The operating system for the virtual machines will be either Windows Server 2008 R2 Enterprise or
Windows Server 2008 R2 Standard.
###EndCaseStudy###
You need to implement the planned deployment of a VMM management server in each data center.
Where should you deploy each VMM management server? (More than one answer choice may achieve the
goal. Select the BEST answer.)
What should you include in the recommendation?
###BeginCaseStudy###
Testlet 1
Overview
Proseware, Inc. is an international publishing company.
Proseware has four data centers and 80 offices. The data centers are located in Dallas, Dublin, Bangalore, and
Sydney. The offices are located worldwide.
Existing Environment
Network Infrastructure
The network contains a single-domain Active Directory forest named proseware.com.
Each server has a Baseboard Management Controller (BMC) installed.
Database administrators in the Bangalore data center manage all of the SQL Server servers in the data
centers.
Dublin Data Center
The Dublin data center contains two servers. The servers are configured as shown in the following table.
Operations Manager 2007 R2 agents are installed on all of the servers in the Dublin data center by using the
push installation method.
App1
Proseware uses a critical business application named Appl. Multiple instances of App1 are deployed to each
data center.
Each instance of App1 consists of the following physical servers that run Windows Server 2012:
A database server that runs SQL Server 2008 R2.
Two web servers that are load balanced by using the Network Load Balancing (NLB) feature. Each web
server has a single network adapter.
New versions of App1 are released at least four times a year.
When a new version of App1 is released, all of the servers in App1 must be redeployed.
Requirements
Planned Changes
Proseware plans to deploy all System Center 2012 components.
Proseware plans to implement the following changes in each data center:
Deploy a SQL Server 2008 R2 Enterprise failover cluster.Store all virtual machine data in a Fibre Channel SAN infrastructure.
Deploy a highly available Virtual Machine Manager (VMM) environment.
Deploy one physical server that has Data Protection Manager (DPM) deployed.
Technical Requirements
Proseware identifies the following technical requirements for the implementation of a private cloud:
All Hyper-V hosts must be added to a failover cluster automatically.
The deployment of Hyper-V hosts to each data center must be automated.
The implementation of the DPM infrastructure must meet the following requirements:
– Backups will be stored on an iSCSI SAN.
– Virtual machines in a running state must be backed up from their respective host. Administrators must be
able to restore individual files from host backups on virtual machines configured as file servers.
The implementation of the Operations Manager 2012 infrastructure must meet the following requirements:
– Operations Manager monitoring must not be affected if a single server fails.
– Existing data must be retained in the Operations Manager 2012 infrastructure.
– Existing agents must continue to report to Operations Manager during the upgrade process.
– All Operations Manager agents must report to a local management server in their respective data center.
– The service desk in the Dublin data center must be able to view the status of the servers in all of the data
centers.
Administrative Requirements
Proseware identifies the following administrative requirements:
An administrator must be notified when an error occurs on a server.
An administrator must be able to assign errors to specific administrators for resolution.
Errors that remain unresolved for more than 10 hours must be escalated automatically to another
administrator.
Planned Virtual Machines
The servers in each instance of App1 will be replaced with a set of virtual machines. The planned changes
must meet the following requirements:
Each instance must be redeployed when a new version of App1 is released.
Each instance of App1 must be installed by using the minimum amount of administrative effort.
App2
An application named App2 is hosted on the virtual machines in a Windows Azure public cloud infrastructure.
The performance and availability of the components of App2 must be monitored centrally. Administrators must
be able to modify the configurations of the App2 components.
App3
A service template will be used to deploy multiple instances of a multi-tier application named App3. The vendor
of App3 will provide updates to App3 every two months.
SQL Server Deployment Requirements
VMM administrators plan to deploy many virtual machines that have SQL Server deployed. The administrators
identify the following deployment options for the virtual machines:
The virtual machines will host databases that will be created by using data-tier application (DAC) packages.
The virtual machines will have SQL Server 2008 R2 Standard deployed by using one of six different
configurations.
The operating system for the virtual machines will be either Windows Server 2008 R2 Enterprise or
Windows Server 2008 R2 Standard.
###EndCaseStudy###
You need to recommend a solution to deploy a complete instance of App1 when a new version of App1 is
released.
What should you include in the recommendation?