Which module should you use?
You need to configure Dynamics AX to support moving items from one site to another by using journals.
Which module should you use?
Which order type should you use?
You need to create a draft sales order. The sales order must not include inventory transactions.
Which order type should you use?
Which three configuration technologies are supported on…
Which three configuration technologies are supported on the product master definition? Each correct answer presents part of the solution.
You need to ensure that a quality order is generated au…
You need to ensure that a quality order is generated automatically after you post a product receipt for a purchase order.
What should you do?
You need to set up the configuration route for the new …
You are configuring a new bill of materials (BOM) for a new product. The product is a set of speakers.
You add all of the component items for the product to the BOM lines.
You need to set up the configuration route for the new product to meet the following requirements:
The power of the speakers must depend on the speaker enclosure.
The speaker enclosure must depend on the wiring harness.
What should you do?
What is the maximum number of BOM versions that can be …
You plan to create multiple bill of materials (BOM) versions.
What is the maximum number of BOM versions that can be approved for the same product?
What should you create?
You create a new product that has a new bill of materials (BOM). The lines for each component are added to the BOM lines.
You need to configure the BOM to prevent the line for item 700 and the line for item 500 from both being selected in the BOM.
What should you create?
where should you create the new BOM?
You are setting up a new bill of materials (BOM) for a new product that your company is designing.
The components for the new product already exist in Dynamics AX the finished good item does not exist yet in Dynamics AX.
From the BOM form, where should you create the new BOM?
You need to ensure that the cost calculation for the BO…
You have a bill of materials (BOM) item.
Ten percent of one of the BOM components is wasted during the manufacturing process.
You need to ensure that the cost calculation for the BOM item is accurate.
What should you do?
Which report should you use?
You have several bills of materials (BOMs) that include an item manufactured by a third party.
The third party plans to discontinue the production of the item.
You need to locate all of the BOMs that include the item.
Which report should you use?