You are the Test Manager of a project that adopts a V-model with four formal levels of testinG.
unit, integration, system and acceptance testing.
On this project reviews have been conducted for each development phase prior to testing, which is
to say that reviews of requirements, functional specification, high-level design, low-level design
and code have been performed prior to testing.
Assume that no requirements defects have been reported after the release of the product.
Which TWO of the following metrics do you need in order to evaluate the requirements reviews in
terms of phase containment effectiveness?
A.
Number of defects found during the requirements review
B.
Total number of defects attributable to requirements found during unit, integration, system and
acceptance testing
C.
Total number of defects found during functional specification review, high-level design review,
low-level design review, code review, unit testing, integration testing, system testing and
acceptance testing
D.
Time to conduct the requirements review
E.
Total number of defects attributable to requirements, found during functional specification
review, high-level design review, low-level design review, code review, unit testing, integration
testing, system testing and acceptance testing
Explanation: