What would the items in the following graphic best be collectively called?

What would the items in the following graphic best be collectively called?

A.
Business impact values

B.
Activation phase values

C.
Maximum tolerable downtime values

D.
Reconstitution impact times and values

Explanation:
C: Maximum tolerable downtime values. This is the timeframe between an unplanned interruption of business operations and the resumption of business at a reduced level of service. The BIA identifies which of the companys critical systems are needed for survival, and estimates the outage time that can be tolerated by the company as a result of various unfortunate events. The outage time that can be endured by a company is referred to as the maximum tolerable downtime.