PrepAway - Latest Free Exam Questions & Answers

When an analyst sees the system notification “The appliance exceeded the EPS or FPM allocation within the la

When an analyst sees the system notification “The appliance exceeded the EPS or FPM allocation within the last hour”, how does the analyst resolve this issue? (Choose two.)

A. Delete the volume of events and flows received in the last hour.

B. Adjust the license pool allocations to increase the EPS and FPM capacity for the appliance.

C. Tune the system to reduce the volume of events and flows that enter the event pipeline.

D. Adjust the resource pool allocations to increase the EPS and FPM capacity for the appliance.

E. Tune the system to reduce the time window from 60 minutes to 30 minutes.

Explanation:
User response
Adjust the license pool allocations to increase the EPS and FPM capacity for the appliance.
Tune the system to reduce the volume of events and flows that enter the event pipeline.

Reference: https://www.ibm.com/docs/en/qsip/7.3.2?topic=appliances-maximum-events-flows-reached


Leave a Reply