PrepAway - Latest Free Exam Questions & Answers

What does this mean?

A user has recently deployed an action to a group of endpoints she currently manages. Several of these machines are reporting Constrained in their Last Reported
Status of the action. What does this mean?

PrepAway - Latest Free Exam Questions & Answers

A.
The action was not given enough time to run on the endpoint before it expired.

B.
The downloads within the action are too large for the client cache. The cache size must be increased.

C.
Scheduling criteria has been set in the Execution tab of the Take Action Dialog which has not been met

D.
The endpoint was shut down during execution and is waiting for the machine to send a heart beat to the server.


Leave a Reply