What would need to be done, if anything, to support thi…
A customer has an existing IBM E850 HA cluster that they are using for the SAP DB. They want to use HANA
and would like to have the E850 to be repurposed for this.
The E850 is a 32-core 1TB server with all cores and memory active. Only 50% of the memory is populated
using 64GB CDIMMs. The HANA DB requires 3TB.
What would need to be done, if anything, to support this requirement?
Which component of the POWER8 system architecture provi…
Which component of the POWER8 system architecture provides improved RAS capabilities relative to
POWER7 system architecture?
Why should a customer consider the selection of POWER8 …
Why should a customer consider the selection of POWER8 Enterprise servers instead of POWER8 Scale-out
servers?
Which of the following is used to identify compatible H…
Which of the following is used to identify compatible HMC and system firmware updates for a given system?
Which virtualization technology allows multiple operati…
A customer has an E870 with AIX, IBM i and RHEL installed.
Which virtualization technology allows multiple operating systems to share the same adapter simultaneously
with low CPU usage?
Which offering supports RHEL workloads on the E870?
A customer has an E870 installed, and is considering migrating a RHEL 6 workload from an x86 system.
Which offering supports RHEL workloads on the E870?
Which solution satisfies the customer’s requirements?
A customer is purchasing two new POWER8 servers: each connected to its own DS8880 at different sites. The
customer wants high availability with the least amount of downtime.Which solution satisfies the customer’s requirements?
What is the duration of the trial period?
A customer has requested a trial offer for Active Memory Expansion.
What is the duration of the trial period?
Which tool is recommended to assist in the design and d…
Which tool is recommended to assist in the design and deployment of partitions?
What is the minimum number of core activations required…
What is the minimum number of core activations required on a Power E870?