how can the administrator correct the configuration?

A system administrator has configured a VIO Server to use a Shared Ethernet Adapter
(SEA) that is built from a link aggregation of gigabit Ethernet adapters. The administrator has
determined that not all ports in the link aggregation are being used. The administrator
verifies that aggregation mode for the Etherchannel is 802.3ad, which is the corporate
standard, and that the Ethernet ports on the server are connected to the correct ports on the
network switch. The administrator then runs the entstat command against the SEA (ent28),
and receives the following output.$ entstat -all ent28Real Adapter:
ent26ETHERNET STATISTICS (ent26) :
Device Type:
IEEE 802.3ad Link AggregationHardware Address:
00:14:5e:e9:25:81…Statistics for every adapter in the IEEE 802.3ad Link Aggregation:
——————————————————————Number of adapters:
2Operating mode:
Standard mode (IEEE 802.3ad)IEEE 802.3ad Link Aggregation Statistics:
Aggregation status:
Negotiating LACPDU Interval:
Long Received LACPDUs:
0 Transmitted LACPDUs:
62498 Received marker PDUs:
0 Transmitted marker PDUs:
0 Received marker response PDUs:
0 Transmitted marker response PDUs:
0 Received unknown PDUs:
0 Received illegal PDUs:
0Hash mode:
Destination IP addressBased on this output, how can the administrator correct the
configuration?

What is the maximum entitled capacity and virtual processors which can be allocated?

A system administrator has a Power 770 with 12 cores.
The following LPARs already exist:
LPAR1 – 9 dedicated cores
LPAR2 – 1 virtual processors with an entitled capacity of 0.2
LPAR3 – 1 virtual processors with an entitled capacity of 0.8
The administrator wants to create a fourth LPAR. What is the maximum entitled capacity and
virtual processors which can be allocated?

Which of the following situations will prevent proper installation?

A customer is planning to convert vacant office space to a data center that will be populated
with several standard Power 795 systems. During a pre-delivery site inspection, the
customer is told by the Installation Planning Representative that the data center is
inadequately equipped to receive the systems. Which of the following situations will prevent
proper installation?