Which of the following must be purchased to meet this need?
A customer wants to purchase a p460 solution and obtain more cores over time as needed.
Initially the customer requires 16 cores and need to increase to 32 cores over time. Which of the
following must be purchased to meet this need?
What would be an advantage to making the change?
A customer has multiple IBM POWER5 servers running IBM i5/OS V5R4. They want to
consolidate these servers onto PureFlex p260 Compute Nodes. What would be an advantage to
making the change?
Which of the following IBM systems management tools provides virtualization of ethernet MAC and Fibre Channel
Which of the following IBM systems management tools provides virtualization of ethernet MAC
and Fibre Channel WWPN addresses for PureFlex Systems?
Which of the following is the maximum number of drives per control enclosure and maximum number of expansion e
A PureFlex Enterprise prospect asks what is the maximum number of 2.5″ HDDs/SSDs drives that
can fit in each Storwize V7000 control enclosure and how many enclosures are supported for a
2076-124 in a non clustered configuration. Which of the following is the maximum number of
drives per control enclosure and maximum number of expansion enclosures in this situation?
Which of the following requires the greatest communication and coordination between all three departments?
A PureFlex prospect has separate server, storage and network teams that communicate only
through department managers. Which of the following requires the greatest communication and
coordination between all three departments?
Which of the following accomplishes this task?
A Power customer running AIX asks how they can perform a bare metal migration of an AIX
operating system environment from a POWER7 750 to PureFlex. The customer is on the current
version of AIX. Which of the following accomplishes this task?
Which of the following should be ordered to meet the customer need?
A customer wants to purchase a p460 node that has the lowest number of active cores on day
one, with the ability to grow to the maximum number of cores over time. Which of the following
should be ordered to meet the customer need?
Which of the following is the maximum amount of memory on the compute node, and memory per core if the memory
A customer wants to purchase a PureFlex foundation with a p460 POWER7 compute node with 16
cores. Which of the following is the maximum amount of memory on the compute node, and
memory per core if the memory is evenly distributed across all cores?
Which of the following describes this environment?
A customer decided to move their payroll and CRM to an externally hosted cloud environment.
Which of the following describes this environment?
Which PureFlex compute node option is full width?
A PureFlex technical specialist is discussing the PureFlex family with a prospective customer.
They are concerned about available chassis space. Which PureFlex compute node option is full
width?