Which of the following network solutions supports the requirements above?

An administrator is designing a new system. Redundancy is critical, and cost must be kept as low
as possible.
The system planned is a Power 770 with 2 enclosures, each with a 10Gb IVE. It will support 6
dedicated production LPARs, 8 development LPARs, and 2 VIO Servers.
Production and development networks must be separate from each other.
Which of the following network solutions supports the requirements above?

How many virtual CPUs should be assigned to the destination LPAR on the POWER7 environment?

A customer is planning to migrate an existing AIX 7 environment from POWER5 hardware to
POWER7. The existing deployment consists of multiple machines, each hosting many LPARs.
Due to software licensing constraints, the new environment must maintain the same number of
logical CPUs. The pmcycles command reports the following on an LPAR on the POWER5
environment:
$ pmcycles -m
CPU 0 runs at 2198 MHz
CPU 1 runs at 2198 MHz
CPU 2 runs at 2198 MHz
CPU 3 runs at 2198 MHz

CPU 4 runs at 2198 MHz
CPU 5 runs at 2198 MHz
CPU 6 runs at 2198 MHz
CPU 7 runs at 2198 MHz
How many virtual CPUs should be assigned to the destination LPAR on the POWER7
environment?

Which of the following configurations will address the architects requirements?

An architect is designing a new POWER7 implementation consisting of a VIO Server (VIOS) and 6
AIX partitions.
AIX partitions need to occasionally access a tape drive for restoration and backup of application
data and tape access will not be required by more than on partition at any time.
The performance of the solution is not critical and the architect wants to keep the cost to a
minimum.
Which of the following configurations will address the architects requirements?